1 / 14

Integrating information towards Digital ATM

Integrating information towards Digital ATM. European view on Global developments. Presented By: Paul BOSMAN Date: August 27, 2013. Agenda. XM - State of the union XM information service exchange – H ow real is it all ? The ‘GIF’ Architecting A last minute bonus.

ida
Download Presentation

Integrating information towards Digital ATM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrating information towards Digital ATM European view on Global developments Presented By: Paul BOSMAN Date: August 27, 2013

  2. Agenda • XM - State of the union • XM information service exchange – How real is it all ? • The ‘GIF’ • Architecting • A last minute bonus

  3. XM - State of the (global) union • AIXM • Increasing implementations • Digital NOTAM • Lessons learned • WXXM • IWXXM • Reality mapping • Data coming (really) AIRM • FIXM • Impressive momentum–v2/CCB • OPS connect What about me ? AIDX, AMDB, Asterix, Inspire, NIEM, PIXM, TIXM, …

  4. SESAR SWIM Masterclass 2013 >20 data providers, >50 data consumers, >100 participants, (Non-OPS) May – November 2013 Exchanged information services: Flight, Weather, Aeron, Surveillance, Environment, Aircraft, Support, …

  5. SESAR Registry - I • Pilot implementation • Objectives • TrackingMasterclass participants & contributions • Promotion of Models, Compliance Criteria, Assessment tools • Market place • Content > 50 Organizations (Providers & Consumers) > 50 Services (From doc to WSDL/…)

  6. SESAR Registry - II Lessons learned Usage = Obligation * Benefit * Guidance Information Quality - Validation very resource intensive Sensitive information Next Steps Governance support (AIRM/Services/…) Design time  Runtime  Real time Policy enforcement Federating Registries (e.g. FAA/ICAO/…) trials

  7. A zoom-inAIXM lessons learned • AIXM5.1 data from +- 10 different system suppliers & sources tested • Data, Model, Documentation • Findings Techno • Syntax • XSD code generation • Samle datasets • Limiting rules • Common test/compliance 'service'  • Semantic • Common Business Rules • Improved reference to Authorative documents • Guidance

  8. Compliance Increasingly demand for compliance rules/tools/agreements Remember last year ‘NSDMCG’ Answer  Global Interoperability Framework (GIF)

  9. Example : AIRM in the Global Interoperability Framework L3 : Constraints AIRM Compliant L2 – Properties & Relationships AIRM Compatible L1 – Entities AIRM Ready Now being applied to AIXM, WXXM, FIXM but also e.g. EUROCAE/RTCA standard ED-99C, User Requirements for Aerodrome Mapping Information

  10. Architecting Remember the 300 rafts down the Colarado river ? The SESAR answer  European ATM Architecture

  11. Example : i4D / CTA European ATM Architecture Key Architecture Elements Cost effectiveness/Fuel Eff. Predictability Service Capability Activity Operational Improvement Validation Target Operational Focus Area Traffic Situation Awareness Traj Exec & Monitoring Traj Revision & Update Objective Not : total control But : Fixing inconsistencies, gaps, duplications But also : Killing the hobbies  Building realistic implementation plans Information Element Information Exchange Enabler # XYZ Negociate & allocate CTA Update / Revise Trajectory Report Aircraft ETA MinMax Report Aircraft Trajectory Service Payload : AIRM Aircraft Enroute/APP ATC XMs/… (FIXM/ED133/…) System

  12. The bonus Building on the NM B2B – SWIM Pioneer Flight & Aeronautical information webservices Disclaimer: Only a subset, great learning experience (techno , syntax +- , Semantics  )

  13. Conclusions • Digital Data exchange is only tip of iceberg of much bigger Business transformation • A lot more guidance will be required • And as compliance questions will not go away yes, also a Global Interoperability Framework • Supported by a mixture of joint developments, trials/demos, specifications, and … common architecturing • In all cases its hard (and mostly fun) work ;-)

  14. Questions & Contact Information • EUROCONTROL http://www.eurocontrol.int/im http://im.eurocontrol.int/wiki Click here to access the NOP B2B • SESAR Joint Undertaking http://www.sesarju.eu/swim • Data Exchange models • Aviation Information Data Exchange www.aidx.aero • AIXM - Aeronautical Information Exchange Model www.aixm.aero • WXXM – Weather Information Exchange Model www.wxxm.aero • FIXM - Flight Information Exchange Model www.fixm.aero • E-mail paul.bosman@eurocontrol.int

More Related