120 likes | 258 Views
P11228 Week 3. Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss. Agenda . Customer Needs Engineering Specs System Level Work System Risks Plans for Week 4. Customer Needs. “Go faster” Manual override Easy to actuate Internal energy source
E N D
P11228Week 3 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss
Agenda • Customer Needs • Engineering Specs • System Level Work • System Risks • Plans for Week 4
Customer Needs • “Go faster” • Manual override • Easy to actuate • Internal energy source • Minimal impact on car electrical system • Actuate at least as fast as driver • High sensor resolution • Operate for the entire endurance event • Minimal mass • Control system in low temperature environment • Rapid maintenance
Engineering Specifications • “Go faster” < 4 sec • Manual override Y/N • Easy to actuate lbf • Internal energy source Y/N • Electrical system impact max 2.3A, 14v • As fast as driver < 200 ms
Engineering Specifications • Sensor resolution deg,in,psi/bit • Entire endurance > 200 shifts • Minimal mass 6-8 lb • System environ < 80°C • Rapid maintenance < 2 hr
System Level – Functions • Automated clutch system to achieve maximum acceleration performance through tire/engine optimization
System Risks • Component lead times • Linear potentiometer (4-6 weeks) • Rotary potentiometer (5-7 days) • Pneumatic cylinder (3-6 weeks) • Cost/budgeting • Packaging constraints • Familiarity with involved systems • Engine • Control • Failure • Customer delays • Maintenance time
Plans for Week 4 • High level feasibility studies • Functional decomposition • Determine clutch activation parameters • Determine ability to modulate clutch position • Determine necessary system resolution • Define system architecture • Start Simulink model