An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P11228Week 3 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss

  2. Agenda • Customer Needs • Engineering Specs • System Level Work • System Risks • Plans for Week 4

  3. Customer Needs • “Go faster” • Manual override • Easy to actuate • Internal energy source • Minimal impact on car electrical system • Actuate at least as fast as driver • High sensor resolution • Operate for the entire endurance event • Minimal mass • Control system in low temperature environment • Rapid maintenance

  4. Engineering Specifications • “Go faster” < 4 sec • Manual override Y/N • Easy to actuate lbf • Internal energy source Y/N • Electrical system impact max 2.3A, 14v • As fast as driver < 200 ms

  5. Engineering Specifications • Sensor resolution deg,in,psi/bit • Entire endurance > 200 shifts • Minimal mass 6-8 lb • System environ < 80°C • Rapid maintenance < 2 hr

  6. System Level – Functions • Automated clutch system to achieve maximum acceleration performance through tire/engine optimization

  7. System Level – Logic

  8. System Level – Pneumatics

  9. System Level – Packaging

  10. System Risks • Component lead times • Linear potentiometer (4-6 weeks) • Rotary potentiometer (5-7 days) • Pneumatic cylinder (3-6 weeks) • Cost/budgeting • Packaging constraints • Familiarity with involved systems • Engine • Control • Failure • Customer delays • Maintenance time

  11. Plans for Week 4 • High level feasibility studies • Functional decomposition • Determine clutch activation parameters • Determine ability to modulate clutch position • Determine necessary system resolution • Define system architecture • Start Simulink model