320 likes | 480 Views
LEAN SYSTEMS TOOLS AND PROCEDURES. Module Objectives. Understand and apply the major tools and procedures that lean systems philosophy draws upon in achieving its objectives
E N D
LEAN SYSTEMS TOOLS AND PROCEDURES
Module Objectives • Understand and apply the major tools and procedures that lean systems philosophy draws upon in achieving its objectives • Learn how to use such calculations as TAKT time to synchronize and balance flows and to achieve the objectives of one-piece part flow • Understand how developments such as improvement can be made to generate real benefits for management and for the value-driven operations management system
Lean Systems’ Objectives Produce only the products (goods or services) that customers want. Produce products only as quickly as customers want to use them. Produce products with perfect quality. Produce in the minimum possible lead times. Produce products with features that customers want, and no others. Produce with no waste of labor, materials, or equipment; designate a purpose for every movement to leave zero idle inventory. Produce with methods that reinforce the occupational development of workers.
Raw Saw Lathe Materials Start of production Mill Worker in motion Finished Press Lathe Parts End of production Heat Treat Technology Layout - Example
Focused Factories • Plants-within-a-plant • Market-focused factory • Process-focused factory
Total Productive Maintenance • Downtime due to equipment failure • Downtime for setups and adjustments • Speed losses due to idling and minor stoppages • Speed losses due to discrepancies between designates and actual speeds of equipment • Defect losses due to process defects that cause scrap and quality problems • Defect losses due to reduced yields in the time between machine startup and stable production
TPM Principles • Maximize equipment effectiveness • Establish a thorough system of preventive maintenance for the entire life span of equipment • Implement maintenance programs in all organizational areas • Involve every single member of the organization • Assign responsibility for preventive maintenance to small, autonomous groups of employees rather than managers
Five Components of TPM • Regulating basic conditions • Adhering to proper operating procedures • Restoring deterioration • Improving weaknesses in design • Improving operation and maintenance skills
TAKT Time • Calculate the Net Available Operating Time (NAOT) • Calculate the customer requirements per period • Calculate the TAKT time • Calculate the operator cycle time and the machine cycle time • Adjust the process capacity to achieve balance between the rate of demand and the rate of supply
Kanban (Pull) Scheduling In lean systems, kanban is a name for a system of signals or control cards that govern material movements through an OM system
Pull versus Push Scheduling Kanbans are used to create a pull scheduling system that begins production only when an internal or external customer sends a signal. A push scheduling system directs a worker to produce according to a schedule and to move output to the next worker center in its route when it is completed
Kanbans in Operation Work Work Center Center A B Status: Status: Idle Busy Production Kanban Withdrawal Kanban
Movement of empty bin with withdrawal kanban Work Work Center Center A B Status: Status: Idle Busy Production Kanban Withdrawal Kanban Kanbans in Operation Use of Withdrawal Kanban
Movement of bin Empty bin Work Work Center Center Movement of bin A B after filled Status: Status: Busy Busy Production Kanban Withdrawal Kanban Kanbans in Operation Impact of Production Kanban
Benefits of Kanban • Reduced inventory levels • Less confusion over sequences of activities • Less obsolescence of inventories while in storage • Smaller floor-space requirements for storing inventory • Reduced lead times • Improved quality • Higher employee productivity • Greater system flexibility
Benefits of Level, Mixed-Model Scheduling • Smoother response to market demand • Simpler coordination of supply • Flatter learning curves • Less inventory
Setup Reduction • Process teardown time • Learning time • Process preparation time
Reducing Setup Times • Evolve toward lot sizes of one unit • Run every part every day • Make the first piece right every time • Keep setup times to 10 minutes
Techniques to Reduce Setup Times • Process flow analysis of setup times • Housekeeping • Practiced teamwork • Single-minute exchange of dies (SMED)
Quality at the Source • Jidoka • Stop-and-fix/Line-stop systems • Andons/Trouble lights
Poka-Yoke Prevents the worker from making an error that leads to a defect before starting a process, or Gives rapid feedback of abnormalities in the process to the worker in time to correct it
5 S’s or Kaizen(Yasuhiro Monden, 1993, Toyota Production System) • Seiri - Proper arrangement & organization • separate necessary items from unnecessary items • eliminate unnecessary items (clear up space) • Seiton - Orderliness. Arrange and identify things • organize items • Seiso - Clean up. Specify cleanup procedures. • cleaning • Seiketsu - Cleanliness. Maintain the 3S above • standardize • Shitsuke - Discipline. Habitually conform • training and discipline (i.e., visual control)
Benefits of the 5-S’s • An environment that encourages standard work • Creation of the conditions for perfect quality • Visual control • A high value on safety • Increased employee satisfaction
Standardize Implement Expose New Problems Methods Solve Problems Standardization/Simplification Cycle of Improvement
Kaizen/Continuous Improvement • Short term • Team-oriented • Highly focused • Action-oriented • Verifiable metrics • Repetitive