Modernization of Connection Performance Properties

PPI. TECHNOLOGY SERVICES. Modernization of Connection Performance Properties. Introduction: Need. Connections: 70% to 90% of Failures!. Introduction: Need Performance, Schedule, Cost. Unknown Performance of Connections- many weights have no acceptable connector

issac
Download Presentation

Modernization of Connection Performance Properties

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PPI TECHNOLOGY SERVICES Modernization of Connection Performance Properties

  2. Introduction: Need Connections: 70% to 90% of Failures!

  3. Introduction: NeedPerformance, Schedule, Cost • Unknown Performance of Connections- many weights have noacceptable connector • Pipe Performance exceeding connection ratings 2. Supply Requirements: competitive bids, Multi-source for meeting schedule requirements 3. Cost: • 10-50% of the tubular cost • Failure- Financial Loss • Liability- life and property

  4. Connection Reliability Environment:Test Load Envelope/ cycling, SLE, Failure Points, Temperature Installation:Torque, RPM, Thread Compound Application Manufacturing (Drawing No./Overlay No) Foundation: Design Related(FEA, ISO 13679, Design Calcs) • Design: Test to Dimensional, Makeup, and Load Extremes • Database Provides Dimensional specifications. • Run Per Specification, within Service Load Envelope Qualification has Eliminated Failures!

  5. Methodology: Test • Connection Qualification: DEA27, 5C5, 13679 • Manufacturers test budget can exceed $2.0 MM/yr • Approx 6 major Suppliers/ 30+ connection types • Over 15 years of Modern Data with Failures • Database: Search Engine with Data Reduction • Hierarchal Relational Database per Test Class • Quick select dataset, with graphic output • Output usable in Casing Design von Mises Format

  6. Proprietary Classifications • MTC-Metal to metal seal threaded & coupled (Vam TOP, Fox, TC-II, HPC, 563, Antares MS, APEX, NK-3SB, NS-CC …) • SLH-Slim line high performance (SLX, NJO, SLIJ II, Seal-Lock SF, ULT…) • IFJ-Integral flush joint (STL, FJL, 511 …) • SPT-Semi Premium Thread seal (Big Omega, Boss...)

  7. Connection Test Data • Service Companies commit over $6MM annually to connection testing; $40MM total/ 750 tests • Testing: ISO13679, DEA27, API 5C5, User Specification, Product Line qualification, CRA • Robust: Service Load Envelope, Test Load Envelope, Cycling, Temperature, Failure, Makeup • Data is critically reviewed to delineate Class 4 Qualification test from Class 1 demonstration

  8. Connection Test Data:Higher Level Results High Level Test Data: Overview of test vs. Product Tested

  9. Connection Test DataDetailed Graphical Results Specimen Test Data: Define Service Load Envelope

  10. Project Cost: 1. Acquire test reports 4-8 hr/supplier Feb-March 2. Coordinate Software 20 hr Feb-August 3. Coordinate Suppliers 8 hr/supplier Feb-April 4. Review/ interpret data 4 hrs/report Feb-July 5. Request additional data 4-8 hr/product March-July 6. QC data/ supplier review 8 hrs/ product April-Aug 7. Finalize data presentation 8 hrs/participant May-Sept

  11. Project Benefits Short Term: • Profit from $40 MM Testing performed over 15+ years • Competitive Bid, Competitive Delivery • Save Time: One Stop for Objective Connection Data • Address Deepwater, Modern Performance Properties Long Term: • Network, Leverage, and Direct $6+MM Product Development Effort • Upgrade Casing Design Program: Include Connectors • Lower Procurement Cost/ Reduced Trouble Time

  12. Conclusion: Capture Learnings Highly Leveraged Project Cost Price Sensitive Product: 10% to 50% tubular cost Primary Cause of Failure Cost: Savings from a fraction of a single order 9-5/8, 53.5# @ $1000/ton, Connection cost: 50% tubular reduced to 25% tubular: Equivalent to 100 joints