450 likes | 467 Views
This presentation discusses the achievements and targets of the NWO-CFA Unit, QoS operational parameters, and potential subsidy losses. It also addresses general issues, pending payments, penalty avoidance, and energy saving measures.
E N D
Bharat Sanchar Nigam Limited Rajasthan Circle Weekly Meeting with Hon’ble CGMT 01st May 2013 Presentation of NWO-CFA Unit
SSA-Wise Achievement of QoS Operational Parameters of Mar.13
DSPT fault status as on 30.04.13 All the DSPTs may be kept functional and faulty units may be got repaired through AMC ( as BSNL is spending huge amount on AMC)
by Kiosks and USO subsidy by Kiosks and rural BB B • Subsidy of Rs. 12,94,153/- per qtr may be grabbed by installation of kiosks in existing 63 USOF DSLAMs. • More subsidy can be grabbed by installation of kiosks in 362 new DSLAMs to be installed. • Penalty may also be avoided by installation of at least one Kiosk per DSLAM. • 40972 rural BB connections are yet to be provided to avoid penalty.
General Issues • Bills of M/s Elite-core for Net-One service are pending for payment due to non-receipt of certified copy of bills from following SSAs. • Bills for year 2009: SGR (DEC 09), UPR (DEC 09) • Bills for year 2010: BAM, BND, JLW, KTH, SGR & UPR • QTPC of NT Switches has not been received from following SSA. • EWSD: UPR(10.8.2012 to 10.02.2013) • OCB: BSW, BAM, BIK, JP, JSM, JLW, JJN, JDP, KTH, • PLI, SRO, SGR & UPR
General Issues • Penalty imposed by JVVNL due to excess load/ poor power factor • Report is yet to be recd. from AJM, BIK, BLW & NUR SSAs. • Creation of “Islands of Excellence” in each SSA • Report is yet to be recd. from ALW, JSM, JDP, NUR, SGR & UPR SSAs. • Review of OB Cancellation for NTC provisioning • Report is yet to be recd. from BSW, BAM, BTP, BLW, BIK, JDP, NUR, SIK, SGR & UPR SSAs.
General Issues • Energy Saving in maintenance expenditure post conversion of C-DOT MBMs into RSUs . • Report is yet to be recd, from BLW, BND, NUR & SIK SSAs. • Information of exchanges having monthly revenue less than Rs. 2000/- p.m. • Report is yet to be recd. from ALW, BAM, BLW, BND, JDP & UPR SSAs. • Information reg. spare C-DOT Eqpt. lying unused in SSAs post consolidation of switching n/w • Information is yet to be recd. from AJM, ALW, BAM, JSM, JDP, NUR, SIK, SGR & UPR SSAs.
General Issues • Disposal of un-used material of exchanges • Information is yet to be received from BAM, BIK, JSM, JDP & SGR SSAs. • Staff rearrangement post conversion of C-DOT MBMs into RSUs • Report is yet to be recd. from AJM, ALW, BTP, BLW, JDP, NUR, PLI, SIK & SGR SSAs. • Details of Space/ Rent/ Energy expenses etc. in telephone exchanges • Report is yet to be recd. from ALW, BAM, JLW, JDP, NUR, PLI, SIK, SRO & UPR SSAs.
General Issues • Identification/ Utilization of Cards/ equipments lying spare in exchanges-Reg. • Information received only from CRU, JLW &TNK SSA. • Shutting down of additional AN-RAX Unit for saving of maintenance expenditure • Compliance is yet to be received from ALW, BSW, BAM, BIK, NUR, PLI, SIK, SRO & UPR SSAs. • Expenditure incurred on repairing of EPBTs • Information is yet to be recd. from AJM, BAM, BIK, BND, CRU, JLW, NUR, SIK & SRO SSAs.
TAX NMS Report of Critical Performance Parameters ( Aggregated both for DBH and NBH for the month of Apr.13)
Achievement of 2012-13 for conversion of C-DOT MBMs into RSUs
Action plan of 2013-14 for conversion of C-DOT MBMs into RSUs
Switch-wise status of Faulty IOPs in the Rajasthan as on 30/04/13
SSA Wise Reports/Information pending (Status as on 30/04/13)
Pending PG cases Booked on CPGRMS/MINISTER CASES (as on 30-04-2013)
Pending PG cases Booked on CPGRMS/MINISTER CASES (as on 30-04-2013)
Pending PG cases Booked on CPGRMS/MINISTER CASES (as on 30-04-2013)
Pending PG cases Booked on CPGRMS/MINISTER CASES (as on 30-04-2013)
Pending PG cases Booked on PGRAMS CASES (as on 30-04-2013) and analysis
Pending PG cases Booked on PGRAMS CASES (as on 30-04-2013) and analysis
Landline faults through CDR system (ason 30-04-2013) Landline faults through CDR system
Landline faults through CDR system (as on 30-04-2013) Landline faults through CDR system
IVRS based VAS Number of franchisees for Raj. LSA : 04 M/s. OnMobile Global Ltd., B’lore (12555XXX) (Agreement valid upto 30.11.14) M/s. Spice Digital Ltd., Noida (1263XXXX) (Agreement valid upto 30.07.14) 3. M/s. IMImobile Pvt. Ltd., Hyderabad (56700) (Agreement valid upto 20.01.15) 4. M/s. PrasarBharti Ltd. Jaipur (125800 & 125900) (Agreement valid upto 15.12.13)