Learn about Safety Assurance component as a crucial function in ensuring confidence in safety risk controls within the FAA. Discover how data acquisition, analysis, internal audits, and employee reporting systems play key roles in continuous monitoring and process improvement.
E N D
Policy (Structure) Risk Management Safety Assurance Safety Promotion Federal Aviation Administration SMS Details: Safety Assurance Component
Objective of Safety Assurance • Assurance: “something that gives confidence”1 • Safety Assurance: “something that gives confidence in safety risk controls.” 1 Black’s Law Dictionary
Safety Assurance Functions: • Collect and analyze information to determine that process requirements are continuously being met. • Assess performance and effectiveness of risk controls. • Works in partnership with Safety Risk Management (SRM). AC 120-92
S.A. is similar to Q.A. • QA focuses on product conformity & customer satisfaction on a continuous basis. • SA ensures that risk controls, once designed and put to place, perform in a way that continue to meet their safety objectives. • Integration of management systems may be beneficial. AC 120-92
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action System Monitoring Written documentation to describe: Who, What, When, Where, Why, How • The system monitoring includes: • System description, including risk controls added during SRM. This forms the basis for SA functions such as audits and analysis. • Monitoring of risk controls during operations, AC 120-92
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Data Acquisition and Processing Types of Data Sources • Continuous Monitoring • Internal Audits • Internal Evaluation • External Audits • Investigations • Employee Reporting Systems SMS Framework Elements 3.1.1 through 3.1.6
Accomplish continuous monitoring of day-to-day activities & processes Have direct responsibility for process control Must ensure that processes in their areas function as designed. System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Continuous Monitoring Where SRM and SA interface - risk controls Line managers of operational departments:
Continuous Monitoring - Operational Data Sources • Flight dispatch records • Flight schedules • Financial data • Crew schedules and records • Warranty return reports • Aircraft discrepancy reports • Flight cancellation and delay reports
This is where: Deficiencies in processes contribute to risk Audits provide feedback to process owners Direct supervisory control and resource allocation can help to maintain effectiveness of risk controls System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Internal Audits The day-to-day responsibility for safety management rests with those who “own” the technical processes.
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Internal Audit Design • Performed by each department. • Department Director/Manager is responsible. • Regularly scheduled • Include contractors & vendors • Determine: • Conformity with safety risk controls • Performance of safety risk controls • Performance to meet safety objectives • Deficiencies always get action! AC 120-92
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Internal Evaluation • Performed by a functionally independent person or organization (e.g. QA, Safety) • A process-oriented control function • Backs up the internal audit function • Uses sampling to validate SA processes
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action External Audits Conducted by: • Code-share partners • Industry organizations (e.g. C.A.S.E.) • Third parties: consultants • The regulator (FAA) = “Safety Oversight”
Safety investigations Traditional Approach – put the event behind us (everything is okay): To reassert trust and faith in the system (as is) To resume normal activities To fulfil political purposes SMS Approach - Improved system reliability: To learn about system vulnerability To develop strategies for change To prioritize investment of resources System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Employee Reporting • Employee safety reporting is required & a feedback system is encouraged. • Must provide confidentiality. • Employees must be encouraged to use the system. • Data may identify emerging hazards. • Data must be included in analysis. AC 120-92, App. 1
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Types of analysis • Against criteria/objectives • Compared to “norms” • Patterns from multiple data points • Trends over time • “Trends” is one of the most misused term in analysis • Must have stable, reliable measures at each time sample for a valid trend
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action System Assessment • Are objectives being met? (“Happy loop”) • Risk controls failing due to: • Lack of supervision • Lack of resources • Lack of training • Poor job aids • New Hazard/failed Risk Controls (Redesign - back to SRM) • Prioritize according to safety criticality (triage)
System Operation Data Acquisition & Process Analysis System Assmt Preventive/Corrective Action Preventive/Corrective Actions • Increased supervision • Emphasized procedures • Equipment maintenance • Remedial training • Schedule changes • Personnel assignments • Health and wellness
Management Review Top management must conduct regular reviews of the SMS, including: • The outputs of SRM & SA • Lessons learned • Need for changes
Continuous Improvement The organization shall continuously improve the effectiveness of the SMS through: • Safety and Quality Policies • Safety Objectives • Audit & Evaluations • Analysis of Data • Corrective and Preventive Actions • Management Reviews AC 120-92
Internal Evaluation SA Process Circle Diagram Continuous Monitoring: Day to day, flight by flight Job by job – supervise! • Design/Re-design • Changes • Failures • Back to SRM Internal/External Audits: Go out and look Analysis, Assessment, & Decision Employee Reporting: Listen the front line Preventive/Corrective Action: Getting back on track Affirmed: Expectations met Investigation: Learn from error