200 likes | 375 Views
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr. 23 Aug 11. Overview. NAVEDTRA 130B, 131B, 132, 134, 135C, 136, 137 NAVEDTRA drafts – 133, 138, 139 Central Site implementation AIM/CPM status support of JDTA w/ participating Center updates
E N D
NETC N7 Status Update to AIM FRBRoy Hoyt, NETC N74Jake Aplanalp, AIM Pgm Mgr 23 Aug 11
Overview • NAVEDTRA 130B, 131B, 132, 134, 135C, 136, 137 • NAVEDTRA drafts – 133, 138, 139 • Central Site implementation • AIM/CPM status support of JDTA w/ participating Center updates • AIM/CPM status support of OCCSTD capture/validation • AIM/CPM integration status w/ Learning Assessment Systems • FEA/BCA capability plans for CPM • NETC/OPNAV N15 integration of NETC domain/acquisition community business processes
Promulgated NAVEDTRAs • 130B (task-based learning content) • 131B (PPP-based learning content) • 132 (Assessment) • 134 (Navy instructor manual) • 135C (Schoolhouse Mgmt) • 136 (ILE learning content) • 137 (JDTA)
NAVEDTRA Drafts • 133 (HPRR) • 138 (course/content modularization) • 139 (FEA)
NAVEDTRA 136 & 137 Impacts on CPM / LO Module Rel 5.0 • Re-evaluated and prioritized existing functional requirements based on 136/137 policies • Re-write has created a need for additional functionality to meet • Design Strategy (IMDP) • Significant copy and link capability in JDTA and Project tabs and in LO Module
NAVEDTRA 136 (ILE) Implementation • Current status • Promulgated by NETC in Nov 10 • 136A in work to address user community feedback and extend/refine ILE learning content business rules • Transition from NAVEDTRA 130/131 (AIM II/AIM I) to NAVEDTRA 136 (CPM/LO Module) • Policy / trigger • Pace of migration • Continuing support for AIM I/II through ????
AIM Central Site Implementation • Management points of contact: • NETC N74: Leslie Desenburg • NETPDTC: Peg David • Center-by-Center implementation schedule: • Initially established by Leslie Desenburg • under review based on NETPDTC move to eDMZ application hosting in early 2012 and related workload for user account re-initialization • Peg David to brief in more detail
CPM Hosting at NETPDTC • NETC N74, N6, NETPDTC, and AIM team in process of migrating the production version of CPM to NETPDTC by 1 Oct 11 • Full IA Certification and Accreditation process underway by NETPDTC/AIM team • CPM Rel 5.0 GAT on new NETPDTC server in early Sep • Benefits Include: • Enterprise hosting and support vs. current R&D environment in Orlando • Co-located with rest of NETC enterprise IT applications and off-site COOP support
OCCSTDS Support in CPM How did we get here?: Started with NETC N74/NAVMAC discussions AIM Team provided a CPM “sandbox” for NAVMAC familiarization NAVMAC developed an OCCSTDS Storybook PPT to describe high-level functionality Initial OCCSTDS tab implementation in Rel 5.0 for creation/management of OCCSTDS data by NAVMAC – crawl functionality Working toward business rule definition of: How OCCSTDS data pulls forward into JDTA tab Life-cycle impacts of OCCSTDS revisions on JDTA-based learning content
Trigger Initiating Process Naval Education and Training Command Course Development & Revision Process Date: 12Jul2011_V1/rh/jtw External Training Requirement Sources: Trigger Initiating Process Training Requirement Identification & Resource Sponsor Commitment NETCINST 1500.9 3 December 2010 NTSP Revision OPNAV N1 Training Requirement Sources: Revision to an Enlisted Occupational Standard Operational Risk Management (ORM) Assessment Requirement Sponsor Provides Formal Correspondence Identifying Training Requirement Resource Sponsor / Training Support Agent Commits to Resource Training Requirement Fleet Performance Assessment Rating Merger Direct Fleet Input Establishment or Revision of a NEC Human Performance Requirements Review (HPRR) End Process NAVEDTRA 133 Human Performance Requirements Review Management Manual June 2011 Perform Job Duty Task Analysis (JDTA) Develop Business Case Analysis (BCA) Develop Training Project Plan (TPP) Develop New Course or Revise Existing Course and Pilot Deliver Course of Instruction Perform Front End Analysis (FEA) Perform Content Quality Review for Content Re-Use or Re-Purpose Course Development / Revision End - to - End Process NETC Course Development / Revision End - to - End Process Course Development & Revision Process Color Key: Job Duty Task Analysis (JDTA) User Guide NETCINST 1510.4 24 February 2010 Front End Analysis (FEA) User Guide NETCINST 1500.6 9 March 2010 NAWCTSD Orlando, FL Quality Evaluation Tool Technical Report 2005-002 June 2005 Business Case Analysis (BCA) Policy NETCINST 1510.3 20 October 2009 NAVEDTRA 130B Task Based Curriculum Development Manual August 2009 NAVEDTRA 135C Navy School Management Manual March 2010 External Training Requirement Sources External Training Requirement Sources Requirement Sponsor & Resource Sponsor Actions NAVEDTRA 131B PPP Based Curriculum Development Manual November 2010 NAVEDTRA 134A Navy Instructor Manual August 2009 OPNAV N1 Training Requirement Sources OPNAV N1 Training Requirement Sources OPNAV N1 Training Requirement Sources NAVEDTRA 136 ILE Course Development & Life-Cycle Maintenance Manual November 2010 NAVEDTRA 132 Navy School Testing Program Management Manual March 2011 Course Development and Revision Process NETC Course Development and Revision Process
AIM/CPM Support of JDTA and Participating Center Updates • CPM Rel 4.1 operational Jan 11 / Rel 5.0 delivered Jul 11 – operational at NETPDTC by 1 Oct 11 • JDTA NETCINST 1510.4 promulgated 24 Feb 10 / NAVEDTRA 137 forthcoming • Center projects: • CPPD/CSFE: Curriculum Developer • SLC/CSCS: IT Rating • CID: Information Professional • NETC N72/Carley: ‘A’ School re-engineering • PMS 420/NAWCTSD: LCS mission pkg JDTA
AIM/CPM Support of OCCSTD Capture/Validation • NETC N74 coordination with NAVMAC • CPM OCCSTDS tab added in CPM Rel 5.0 • AIM team working with NAVMAC and NETPDTC on OCCSTDS data interface with NETC enterprise LAS for fleet validation of preliminary OCCSTDS • Business rules for use of OCCSTDS data in CPM as basis for JDTA in development
AIM Interface with NETC LAS • Support for NETC N51 assessment program as well as NAVMAC OCCSTDS validation • Working with NETC N5/N6/N7, NAVMAC, and PMW-240 for implementation via Atlas Pro Assessment Engine and Survey Engine • Participants: • NAVMAC and NETC N51 as SMEs • NETPDTC/PMW-240 as Navy technical agent for Atlas Pro suite implementation and support • AIM team on Web service data output from CPM, AIM I, AIM II, and LO Module
FEA/BCA Capability Plans for CPM • FEA – NETCINST 1500.6 (NAVEDTRA 139 draft) • BCA – NETCINST 1510.3 • Business processes integrated into NAVEDTRA 136 • AIM team supporting business process definition • Design prototype of CPM support for FEA/BCA in final development for NETC / community review
Integration of NETC Domain/Acquisition Community Business Processes • SPAWAR and NAVSSES Philadelphia working JDTA projects in CPM • NETC N74 working with aviation community (Kelee Plagis of CNAF) on ‘harmonizing’ NAVEDTRA 136-137-138-139 business process with that in Naval Aviation Training System (NATS) Handbook for NETC domain and acquisition community standardization
PPP Repository Status • AIM team supporting NETC N74 (Leslie Desenburg) in operation of the PPP repository hosted on fedsun at NAWCTSD • Hosting will shift to NETPDTC with integration into CPM Rel 5.0
SLC e-Library Project Overview • Goal: Provide site access to electronic library • Validated mission, functions, tasks of Librarians • Developed business rules for access, inventory control , and user requests • Identified publications available electronically to support CINs • Defined functional requirements for e-library layout • Planned for hosting and deployment • Project lead: Beth Wigfield (SLC N6)