1 / 13

NETC N6 Status Update on AIM in the NETC Enterprise Architecture

NETC N6 Status Update on AIM in the NETC Enterprise Architecture. Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr. 23 Aug 11. Overview. Training Delivery and Management Strategic Plan AIM Migration Plan AIM I-II/CPM/LO Module Interfaces with Atlas Pro LO Module ‘Webification ’.

olesia
Download Presentation

NETC N6 Status Update on AIM in the NETC Enterprise Architecture

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NETC N6 Status Update on AIM in the NETC Enterprise Architecture Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr 23 Aug 11

  2. Overview • Training Delivery and Management Strategic Plan • AIM Migration Plan • AIM I-II/CPM/LO Module Interfaces with Atlas Pro • LO Module ‘Webification’

  3. Training Delivery and Management Strategic Plan

  4. AIM Migration Plan • As tasked by NETC N6/N7, the Migration Plan defines AIM Program plan for moving forward: • from the traditional stand-alone/LAN-based AIM I / AIM II baseline • to implement both near-term, enterprise-wide systems for managing the 250,000+ hours of traditional AIM I/AIM II LP/TG-based content now in place and • updated Content Planning Module (CPM) and Learning Object (LO) Module tools to support NETC’s new content formats and business rules per NAVEDTRAs

  5. AIM Migration Plan Contents • Maintenance of traditional AIM I/AIM II capabilities and implementation of Learning Center-based Central Site instances hosted by NETPDTC • Migration of traditional AIM I/AIM II learning content to NETC N7/NAVEDTRA 136 business processes and rules using AIM CPM and LO Module • Enhancements to CPM and LO Module • Interfaces between the AIM toolset and other NETC enterprise software tools: • Corporate enterprise Training Activity Resource System (CeTARS) • Atlas Pro toolset (LMS, ROCCE learning content creation, Assessment Engine, and Survey Engine components)

  6. AIM Migration Plan Schedule

  7. AIM I-II / CPM / LO Module Interfaces with Atlas Pro

  8. AIM I/AIM II and Atlas Pro LMS

  9. CPM/LO Module and ROCCE/LMS

  10. AIM Tools and Assessment/Survey Engines

  11. LO Module ‘Webification’ • Business case analysis • Functional benefits • Integration with other NETC training enterprise architecture

  12. LO Module ‘Webification’ Schedule

  13. Questions?

More Related