1 / 2

Straw tracker NA62 Workshop JINR 29/11-4/12 2009

Straw tracker NA62 Workshop JINR 29/11-4/12 2009. Goals. Present an overview of the results from the test beam 2009, simulation and 64-straw prototype activities Review status of straw material and straw production Converge on important design issues

jennis
Download Presentation

Straw tracker NA62 Workshop JINR 29/11-4/12 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Straw tracker NA62 Workshop JINR 29/11-4/12 2009

  2. Goals • Present an overview of the results from the test beam 2009, simulation and 64-straw prototype activities • Review status of straw material and straw production • Converge on important design issues • Obtain a plan for the chambers design, test and simulation program • Identify and list the issues and questions where more work is needed • Agree on sharing of the work packages in particular in the light of the first chamber in 2010! • Plan for the week: • Today: Results from beam test, simulations and prototype work • Tomorrow: Detector design and visit to the lab • Last day: WP list and plans – closeout

More Related