1 / 37

PRIJEVOZ KONTEJNERA MOREM

PRIJEVOZ KONTEJNERA MOREM. Masovni prijevoz kontejnera za vrijeme trajanja II svj. rata 6.svibnja 1966. službeni početak kontejnerizacije SAD- Bremenhaven 1970. Jugolinija ( kasnije Croatialine) U početku 5 vlastitih brodova ( prvi je bio Pionir) Kasnije 50 i više brodova.

kalia-neal
Download Presentation

PRIJEVOZ KONTEJNERA MOREM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRIJEVOZ KONTEJNERA MOREM • Masovni prijevoz kontejnera za vrijeme trajanja II svj. rata • 6.svibnja 1966. službeni početak kontejnerizacije SAD- Bremenhaven • 1970. Jugolinija ( kasnije Croatialine) • U početku 5 vlastitih brodova ( prvi je bio Pionir) • Kasnije 50 i više brodova

  2. PRIJEVOZ KONTEJNERA MOREM • VELIČINE KONTEJNERA • - danas su najviše u upotrebi ISO standard kontejneri od 20’ i 40’ • - uvode se i 45’, 48’ i 53’ • KONTEJNERI MORAJU ISPUNJAVATI SLIJEDEĆE UVJETE • 1. moraju biti takve konstrukcije da se mogu prekrcavati u svim terminalima na svijetu • 2. širina treba biti max. 2.6 m jer je to maximalna dozvoljena širina vozila, te se tada u njega mogu staviti poprečno 2 europalete • Visina je max 2.9 m jer se utovarom takvog kontejnera na cestovno vozilo dobije visina od 13’06’’

  3. PRIJEVOZ KONTEJNERA M0REM • DEFINICIJA: • Transportno spremište pravokutnog presjeka sa slijedećim obilježjima: • -trajnog oblika • -za višestruku upotrebu • -omogućava prijevoz robe sa više transportnih sredstava • -opremljen uređajima za sigurno i brzo rukovanje • -lako se puni i prazni • -najmanja zapremina je 1m3

  4. KLASIFIKACIJA KONTEJNERA Prema namjeni: univerzalni i specijalni kontejneri Prema materijalu izrade: čelični , drveni, plastični, gumeni Prema korisnoj nosivosti: laki (do 10m3) i teški Prema konstrukciji: sklopivi, nesklopivi, s uređajem za samoistovar Prema mjestu korištenja: za unutarnji, lokalni i međunarodni transport Prema vrsti robe koja se prevozi: univerzalni za pakiranu robu, za rasute terete, tank kontejneri, frigo kontejneri, kontejneri za stoku, kontejneri platforme PRIJEVOZ KONTEJNERA MOREM

  5. PRIJEVOZ KONTEJNERA MOREM • OZNAČAVANJE • Xyzu nnnnnn n • Gbx nn mm • Xyzu- kodna oznaka vlasnika • Gbx- kodna oznaka zemlje • nn- veličina kontejnera • nnnnnn-serijski broj • n- kontrolni broj • mm- kodna oznaka tipa kontejnera

  6. PRIJEVOZ KONTEJNERA MOREM • KONTROLA KONTEJNERA • -VANJSKI IZGLED • MEHANIZAM ZA ZATVARANJE VRATA • PLOMBA, SUSTAV ZA SKLAPANJE, OPREMA ZA TANK KONTEJNER, RASHLADNI UREĐAJ • IDENTIFIKACIJSKI BROJ

  7. PRIJEVOZ KONTEJNERA MOREM • KLASIFIKACIJA KONTEJNERSKIH BRODOVA • - tipični brodovi za prijevoz kontejnera (LO-LO) • - RO-RO • - FLO-FLO • -SEA-TRAIN imaju 3 palube s šinama • -Full container ship ( cellular type ) ( 6 generacija 1968 sa 700 teu do 14000 2010)

  8. PRIJEVOZ KONTEJNERA MOREM • - djelomično kontejnersk brodovi • - preuredivi brodovi • - klasični trgovački brodovi koji mogu prevoziti kontejnere

  9. PRIJEVOZ KONTEJNERA MOREM • KLASIFIKACIJA PO VELIČINI • - Small feeder- do 1000 TEU • - Feeder – od 1001 do 2000 TEU • - Feeder max - od 2001 do 3000 TEU

  10. -Panamax - od 3001 do 5101 TEU PRIJEVOZ KONTEJNERA MOREM

  11. -Post panamax- 5101 do 10000 TEU -New panamax- 10001 do 14500 TEU PRIJEVOZ KONTEJNERA MOREM

  12. Ultra large container vessel – preko 14500 TEU Edith Maersk l= 397m, b=56m, T=15,5m PRIJEVOZ KONTEJNERA MOREM

  13. PRIJEVOZ KONTEJNERA MOREM • PLANIRANJE PUTOVANJA Danas kontejnerski brod -95% radi -5% stoji -80% provede u navigaciji -organizacija rada na brodu za prijevoz kontejnera obuhvaća navigaciju, planiranje ukrcaja i iskrcaja, monitoring, učvršćivanje kontejnera...

  14. PRIJEVOZ KONTEJNERA MOREM • KRCANJE, SLAGANJE, MONITORING, UČVRŠĆIVANJE, PLANIRANJE • Uvjek se krcaju uzdužno osim iznimno kod nekih RO-RO brodova • 40’ uvijek sa vratima prema krmi • 20’ vratima jedan prema drugom kontejneru, uzimajući u obzir da je kontejner na pramcu uvijek okrenut vratima prema krmi • Frigo kontejneri sa vratima prema pramcu, kompresor prema krmi i naravno u blizini priključka na brodsku mrežu

  15. PRIJEVOZ KONTEJNERA MOREM • Kontejneri za rasuti teret sa vratima prema krmi • Tank kontejneri sa ljestvama i termometrom prema krmi • Kontejneri platforme sa izvangabaritnim teretom na najviše točke na brodu da ne smetaju RASPORED KRCANJA KONTEJNERA OVISI O • Rotaciji putovanja • Stabilnosti brodske konstrukcije i opterećenju • Dopuštenom površinskom opterećenju • Količini, vrsti i veličini kontejnera • Opasnom teretu u kontejneru • Vremenu stajanja broda u luci

  16. PRIJEVOZ KONTEJNERA MOREM • ROTACIJA PUTOVANJA • Redosljed luka • Container stowage plan • BAY LIST – izrađuje se za svaki Bay posebno, sadrži podatke o svim kontejnerima ( lika ukrc./ iskrc.,id broj i oznaku, brutto težinu, veličinu kontejnera, tip, moguće oštećenje..)

  17. PRIJEVOZ KONTEJNERA MOREM • DUŽNOST ČASNIKA PRILIKOM UKRCAJA KONTEJNERA • Kontejnere krcati prema planu slaganja ovisno o redosljedu luka • Kontejnere krcati prema pravilima struke vodeći računa o vrsti kontejnera • Provjeriti plombu i oznaku • Provjeriti moguća oštećenja • Ukrcati kontejnere samo s urednom dokumentacijom • Paziti da kontejner sa sve 4 točke legne na čunjeve odnosno twist lockere ( zakretne zatvarače ) • Učvrstiti i osigurati kontejnere na palubi ( lashing plan ) • Tjekom operacije ukrc/iskrc brod održavati uspravnim pomoću stabilizera • Primjeniti mjere predostrožnosti ukoliko se u kontejnerima nalazi opasan teret • Paziti na piramidalni način opterećenja • Kada se krcaju frigo kontejneri odmah ih spojiti na brodsku mrežu. -

  18. PRIJEVOZ KONTEJNERA MOREM • UČVRŠĆIVANJE KONTEJNERA ( LASHING ) • Fiksna oprema : vodilice u bay-evima, čunjevi na palubi, • Prijenosna oprema: premosnice, twist lockeri ( ručni, poluautomatski i automatski ), chain lashing, wire lashing, lashing barr, turn buckle

  19. PRIJEVOZ KONTEJNERA MOREM • FEEDER SERVIS • - Prijevoz kontejnera manjim ( feeder ) brodovima od sabirnog terminala do luke odredišta • Sastoji se od 1. Sabirnog terminala ( Gioa tauro ) 2. Broda matice ( VLCV ) 3. Feeder brodara

  20. PRIJEVOZ KONTEJNERA MOREM • STATISTIKA • - 13.3 % UKUPNE SVJETSKE TONAŽE • - STAROST FLOTE JE 10.5 GODINA • - 2010 PREVEZENO 169 000 000 DWT ROBE KONTEJNERIMA • - U SINGAPURU PREKRCANO 25 866 000 TEU • - UKUPNO U SVIJETU 465 597 573 TEU U 2010 • - OD TOGA U NAJVEĆIM KINESKIM LUKAMA ( 10 LUKA ) 220 000 000 TEU • - NAJVEĆE KOMPANIJE • MAERSK, COSCO, EVERGREEN, MSC,NYK

More Related