1 / 6

Formulation of an Action Programme for the Integrated Management of the Shared NUBIAN AQUIFER UNDP-GEF Project

Formulation of an Action Programme for the Integrated Management of the Shared NUBIAN AQUIFER UNDP-GEF Project . Key Results and Achievements Bridgetown, Barbados October, 2013. Regional Nubian Aquifer. Overview of Nubian Aquifer System ( NSAS) region and location in Africa. .

karl
Download Presentation

Formulation of an Action Programme for the Integrated Management of the Shared NUBIAN AQUIFER UNDP-GEF Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Formulation of an Action Programme for the Integrated Management of the Shared NUBIAN AQUIFERUNDP-GEF Project Key Results and Achievements Bridgetown, Barbados October, 2013

  2. Regional Nubian Aquifer Overview of Nubian Aquifer System (NSAS) region and location in Africa.

  3. Nubian Sandstone Aquifer ProjectOverview • Project started in July 2006. • Water Resources considered to be non-renewable • Countries (Chad, Egypt, Libya and Sudan) cooperating over the past 4 decades • Expressed interest in regional cooperation • Challenge acquire-sufficient knowledge about existing resources within the Nubian Aquifer • 1997-2002 IFAD and CEDARE conducted concluded socio-economic survey resulting in the Regional Information System (NARIS).

  4. Key Outputs and Facts • Final National legal framework document • Regional Legal Report with SWOT analysis of Statutes • Joint Authority established 1989 is now the agreed authority for implementation of the SAP. • The Shared Aquifer Diagnostic Analysis (SADA) scientific basis for development of 3D model • 3D groundwater flow model is the established tool • SAP implementation: Address Ecosystem challenges, Capacity building, Address Legal issues raised in the SWOT.

  5. Signature of the Nubian Aquifer - SAP September 18, Vienna Austria

  6. E.Cole@IAEA.org