1 / 15

Harmonisation Working Group

Harmonisation Working Group. HWG Meeting Wednesday, 22 nd February, 2012 NIAUR Offices Belfast. HWG Agenda. Approval of Minutes. Minutes from HWG meeting – 11 th January 2012. Feedback from HSG. Enduring Solution Project Update. Ann Ferguson / Joan-Edel Smith. ROI HSP Update.

Download Presentation

Harmonisation Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Harmonisation Working Group HWG Meeting Wednesday, 22nd February, 2012 NIAUR Offices Belfast

  2. HWG Agenda

  3. Approval of Minutes Minutes from HWG meeting – 11th January 2012

  4. Feedback from HSG

  5. Enduring Solution Project Update Ann Ferguson / Joan-Edel Smith

  6. ROI HSP Update Conor Garrigan

  7. Market Design Update Today’s Workload Overview

  8. DR1085 V1 - Change to MPD29 - Grouped COS • Change Request • The unmetered market has grown significantly since Market Opening in 2005 • RMDS-driven process review project has assessed the processes in terms of bottlenecks, weaknesses and areas for improvement • This DR has been created to facilitate changes to MPD 29 • At today’s Meeting • Classification as ROI-specific

  9. DR1115 V1 – Sundry Code Changes • Change Request • Use of Meter Configuration Code (Required) in NI Market • Work Type Code Value “W402” in NI Market • Addition of Supplier Codes (NI operations only at this time) • S40 (Budget Energy) • S41 (LCC Power Ltd) • Correction to Suppler Codes (for NI operations) • S08 (Vayu) • Code description changes • Meter Configuration Code “H050 - Interval Meter” • Reject Reason Code “CNM - Change of Tenancy/Legal Entity on 010(CoS)” • Withdrawal Reason Code “E1 – Miscellaneous”. • At today’s Meeting • Recommendation for approval as DR and MCR

  10. DR1116 V1 -Updates to Enduring Solution NI Market Documentation • Change Request • Update of the Enduring Solution NI Market Documentation with corrections, clarifications and pending Discussion Request DR1115 at today’s meeting • At today’s Meeting • Classification as NI-Specific

  11. MCR1079 V5 – HBL V2.3 • Change Request • HBL V2.3 Content Changes • No schema change required • HBL remains consistent with current Version of Harmonised schema • At today’s Meeting • Recommendation for approval

  12. HWG Action Items Open Items as at end of last meeting

  13. Next Steps • Next HWG meeting 4th April, 2012 (Dublin) • Dates for all meetings for 2012 are on the Calendar on the RMDS website

  14. HWG Meeting • AOB

  15. HWG Meeting Thank You

More Related