1 / 20

Harmonisation Working Group

Harmonisation Working Group. HWG Meeting Wednesday, 27 th June, 2012 CER Offices Dublin. HWG Agenda. Approval of Minutes. Minutes from HWG meeting – 23 rd May 2012. Feedback from HSG of 06/06/12. Feedback from HSG. Enduring Solution Project Update. Joan-Edel Smith.

Download Presentation

Harmonisation Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Harmonisation Working Group HWG Meeting Wednesday, 27th June, 2012 CER Offices Dublin

  2. HWG Agenda

  3. Approval of Minutes Minutes from HWG meeting – 23rd May 2012

  4. Feedback from HSG of 06/06/12

  5. Feedback from HSG

  6. Enduring Solution Project Update Joan-Edel Smith

  7. ROI HSP Update Conor Garrigan

  8. Market Design Update – Workload Overview

  9. DR 1117 V1 - MRC Consultation Change Request • MRC currently under review and two specific processes are under development: • MP NI 506 Ability Testing Procedure - To provide a framework for Supplier Ability Testing and • MP NI 507 Market Testing Procedure - To provide a framework for Supplier Market Testing. At Today’s Meeting: • Classification as NI-Specific Requested

  10. DR 1123 V1 – TCC Field Validation on 017 Change Request • An additional validation rule on 017 MM to make the Tariff Configuration Code (TCC) field mandatory when requesting Re-energisation of a prepayment meter. • If the TCC is not provided when requesting Re-energisation of a prepayment meter a 117R MM will be sent to the Supplier with Reject Reason code: ITF - Invalid Tariff Configuration Code. At Today’s Meeting: • Classification as NI-Specific Requested

  11. Previously Approved MCRs for Approval • V2.0 Classified as Harmonisation Impacting at HWG of 04/04/12 • Approval was held over for review by Suppliers • Reversioned following post-Harmonisation Release Planning Workshop • At Today’s Meeting: • Recommendation for approval of Version 3.0 of both MCRs

  12. Previously Approved MCRs for Approval • At Today’s Meeting: • Classification and Recommendation for Approval

  13. DR 1122 V1 – Introduction of Essential Plant into the Market Design Background The traditional practice of ESBN has been not to de-energise essential plant for Non-Payment where Health & Safety issues may arise. This DR seeks to introduce a new flag to allow for an MPRN to be identified in the Central Market System as Essential Plant.

  14. Contd:- DR 1122 V1 – Introduction of Essential Plant into the Market Design • A new flag to be added to the Harmonised Data Definitions with the name Essential Plant Flag and schema name EssentialPlantFlag. • The Harmonised Data Definition for Essential Plant Flag is "As and where an MPRN is determined to be Essential Plant, or where Essential Plant flag has been removed, then this flag will be highlighted." • This flag will be a new Boolean Flag. • value of 1 it will mean that there is essential plant at this MPRN • value of 0 (exceptional) - there is not essential plant at this MPRN • This field is proposed to be populated only where it has been determined that there is essential plant at the MPRN. • The content of the flag will be made available on the Extranet and the downloadable meter point details file as well as certain messages that are indicated on the MCR At Today’s Meeting: • Classification as Harmonisation Impacting and Recommendation for Approval

  15. DR 1097 V1.0 – New Order Status Code for Supplier timeout • To add a new Order Status code "SOTO" with the description of "Supplier Timeout" to be used where the Supplier has received market message 131[S] to re-schedule non-completed fieldwork and Supplier has not re-scheduled within 10 days. At Today’s Meeting: • Classification as Harmonisation Impacting and recommendation for Approval

  16. Previously Approved MCRs for Withdrawal • Details • MCRs Presented at HWG of 23/05/12 and held over for review At Today’s Meeting: • Approval is now being sought to withdraw these MCRs from the Active List.

  17. HWG Action Items Open Items as at end of last meeting

  18. HWG Meeting • AOB

  19. Next Steps • Next HWG meeting 8th August, 2012 (Belfast) • Dates for all meetings for 2012 are on the Calendar on the RMDS website

  20. HWG Meeting Thank You

More Related