Harmonisation Working Group HWG Meeting Wednesday, 27th June, 2012 CER Offices Dublin
Approval of Minutes Minutes from HWG meeting – 23rd May 2012
Enduring Solution Project Update Joan-Edel Smith
ROI HSP Update Conor Garrigan
DR 1117 V1 - MRC Consultation Change Request • MRC currently under review and two specific processes are under development: • MP NI 506 Ability Testing Procedure - To provide a framework for Supplier Ability Testing and • MP NI 507 Market Testing Procedure - To provide a framework for Supplier Market Testing. At Today’s Meeting: • Classification as NI-Specific Requested
DR 1123 V1 – TCC Field Validation on 017 Change Request • An additional validation rule on 017 MM to make the Tariff Configuration Code (TCC) field mandatory when requesting Re-energisation of a prepayment meter. • If the TCC is not provided when requesting Re-energisation of a prepayment meter a 117R MM will be sent to the Supplier with Reject Reason code: ITF - Invalid Tariff Configuration Code. At Today’s Meeting: • Classification as NI-Specific Requested
Previously Approved MCRs for Approval • V2.0 Classified as Harmonisation Impacting at HWG of 04/04/12 • Approval was held over for review by Suppliers • Reversioned following post-Harmonisation Release Planning Workshop • At Today’s Meeting: • Recommendation for approval of Version 3.0 of both MCRs
Previously Approved MCRs for Approval • At Today’s Meeting: • Classification and Recommendation for Approval
DR 1122 V1 – Introduction of Essential Plant into the Market Design Background The traditional practice of ESBN has been not to de-energise essential plant for Non-Payment where Health & Safety issues may arise. This DR seeks to introduce a new flag to allow for an MPRN to be identified in the Central Market System as Essential Plant.
Contd:- DR 1122 V1 – Introduction of Essential Plant into the Market Design • A new flag to be added to the Harmonised Data Definitions with the name Essential Plant Flag and schema name EssentialPlantFlag. • The Harmonised Data Definition for Essential Plant Flag is "As and where an MPRN is determined to be Essential Plant, or where Essential Plant flag has been removed, then this flag will be highlighted." • This flag will be a new Boolean Flag. • value of 1 it will mean that there is essential plant at this MPRN • value of 0 (exceptional) - there is not essential plant at this MPRN • This field is proposed to be populated only where it has been determined that there is essential plant at the MPRN. • The content of the flag will be made available on the Extranet and the downloadable meter point details file as well as certain messages that are indicated on the MCR At Today’s Meeting: • Classification as Harmonisation Impacting and Recommendation for Approval
DR 1097 V1.0 – New Order Status Code for Supplier timeout • To add a new Order Status code "SOTO" with the description of "Supplier Timeout" to be used where the Supplier has received market message 131[S] to re-schedule non-completed fieldwork and Supplier has not re-scheduled within 10 days. At Today’s Meeting: • Classification as Harmonisation Impacting and recommendation for Approval
Previously Approved MCRs for Withdrawal • Details • MCRs Presented at HWG of 23/05/12 and held over for review At Today’s Meeting: • Approval is now being sought to withdraw these MCRs from the Active List.
HWG Action Items Open Items as at end of last meeting
HWG Meeting • AOB
Next Steps • Next HWG meeting 8th August, 2012 (Belfast) • Dates for all meetings for 2012 are on the Calendar on the RMDS website