Harmonisation Working Group

Harmonisation Working Group. HWG Meeting Monday, 17 th January, 2011 NIAUR Offices Belfast. HWG Agenda. Feedback from HSG, 20 Dec 2010. ES Project Update. DR1042 V1.0 – Removal of non-visit keypad meter configuration changes. Change Request

lara-moses
Download Presentation

Harmonisation Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Harmonisation Working Group HWG Meeting Monday, 17th January, 2011 NIAUR Offices Belfast

  2. HWG Agenda Harmonisation Working Group

  3. Feedback from HSG, 20 Dec 2010 Harmonisation Working Group

  4. ES Project Update Harmonisation Working Group

  5. DR1042 V1.0 – Removal of non-visit keypad meter configuration changes • Change Request • Suppliers will no longer be able to request a non-visit keypad meter configuration in NIE • Will improve the accuracy of site configuration and subsequent billing data • Meter Works Type K01 (Change Keypad Meter Configuration - No Site Visit Required) will be removed • Referred to HSG at HWG Workshops on 1 and 20 Dec • No change in DR since presented originally • At today’s Meeting • Approval to MCR and • Approval Harmonisation Working Group

  6. Market Design Work Update Harmonisation Working Group

  7. Harmonisation Baseline (HBL) Update Planning • Approach to Updating HBL • All approved MCRs above are in scope for inclusion in a revised Harmonisation Baseline and are currently available on the RMDS website • Other than these, only Regulatory or emergency changes will be considered for inclusion • MCRs 0178, 0180, 1024 and 1040 are planned for implementation in ROI in June 2011 • A cross-jurisdictional team will work on applying all MCRs in scope to the common elements of the existing HBL • The jurisdiction-specific elements will remain the responsibility of individual jurisdiction-specific teams • Outlook • Work kicks off with an HRDS planning / scoping meeting on 20th January • An outline schedule for the HBL work will be presented at the next HWG Harmonisation Working Group

  8. HWG Action Items closed since last scheduled meeting Harmonisation Working Group

  9. Next Steps • Next HWG meeting 23.02.2011 (Dublin) • Dates for all meetings for 2011 are on the Calendar on the RMDS website Harmonisation Working Group

  10. HWG Meeting • AOB Harmonisation Working Group

  11. HWG Meeting Thank You Harmonisation Working Group