300 likes | 419 Views
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status. Paul Brindza January 26, 2009. SHMS Magnets and Support Structure. SHMS Spectrometer and Magnets SC Magnet Procurement Status SHMS Magnet Recent Progress SHMS Support Structure Conclusions. SHMS.
E N D
Hall C MeetingSHMS Magnets and Support StructureDesign and Procurement Status Paul Brindza January 26, 2009
SHMS Magnets and Support Structure • SHMS Spectrometer and Magnets • SC Magnet Procurement Status • SHMS Magnet Recent Progress • SHMS Support Structure • Conclusions
SHMS Shield House Electronics Room Cryo Transfer Line Power Supplies Target Bender Q1 Q2 Q3 Dipole Detectors
SHMS Horizontal Bend DipoleWarm Iron SC “C” Magnet SHMS Q1 Quadrupole AssemblyJLAB Cold Iron Quad Design (CIQ) SHMS Cosine Θ Dipole Assembly60 cm warm bore- cryo-stable design SHMS Q3 Cosine 2ΘQuadrupole Assembly60 cm warm bore cryo-stable design
SHMS SC Magnet Procurement Strategy • SC Magnets will be built by contractors • In a significant departure from HMS we will provide major SC magnet components • Superconductor (SSC surplus) • Cryo-Control Reservoir( same as HMS Design) • DC Power System( same as HMS) • Magnet Control System( Same as HMS) • Warm Yoke Steel
SHMS SC Magnet System Plan CryogenicControlReservoir DC Power System Magnet Control System Fabricated Cryostated Magnet On Site Integration & Assembly RFPFixed Price Procurement Acceptance Testing Ship to JLAB Conductor Processing Magnet Support & Alignment Warm Iron Yoke Testing SC Cable
Procurement Status of SHMS Magnets • Q1 Magnet bids under evaluation-don’t ask/don’t tell • Q1 Award plan date is March 15, 2009 • Q2Q3 & Dipole RFP released Jan 26, 2009 • Q2Q3D Bids due May 2009, Award Dec. 2009 • HB magnet design review Feb. 10, 2009 • MOU/Contract with NSCL ~ June 2009
Q1 Quad 3D CAD Model Cold Iron Quad Design like HMS Q1Bids are IN!!
Mechanical Requirements • SHMS Minimum Scattering Angle 5.5 degrees • SHMS-HMS angle 5.5+12 = 17.5 degrees • HMS Minimum Angle (present) 10.5 degrees • SHMS Max angle 40 degrees • HMS Max Angle(present ) 85 degrees • Hall C Radius at SHMS max 73 feet • Fit to beam pipe at 5.5 degrees ~ 5 mm • Fit to HMS at 17.5 degrees ~ 1 cm
SHMS Support Structure Reference Design • SHMS Support Structure Preliminary Design completed in 2007 by ALION, a local company with experience in large welded steel structures • SHMS Support Structure Reference Design(RD) Completed by ALION January 28, 2009 • RD will be the technical elements for the bid packages for the SHMS support structure. • SHMS Support Structure RD review was held in December 08 at JLAB
Top View SHMS & HMS Spectrometers Dipole Q3 Q2 Q1 Bender Beamline Target HMS Spectrometer
Bottom View SHMS wraps around front of HMS HMS SHMS Beamline stands
Bender fit up to HMS Q1 Bender HMS Q1
Q3 & Dipole fit up SHMS Dipole SHMS Q3 24” Beamline Q2 Shield House notch Beamline Stand
Shield House fit up Shield House Dipole Beamline Q3 Q2 Q1 Shield House notch Bender
Conclusions • SHMS SC Magnet designs are sound, reviewed and procurement has started • JLAB is a partner in the SHMS Magnet fabrication Superconductor, Cryogenic Interface, Iron Yokes DC systems and PLC based controls. • SHMS Support Structure Reference Design is complete detail design and fabrication begins FY10 • Since we haven’t spent a dime yet We are still On time and On budget!!