LCLS-II will use sectors 11-20 (2 nd kilometer of SLAC linac) + a bypass line

LCLS-II Linac Layout Issues. LCLS-II will use sectors 11-20 (2 nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF in the first half of 20 (20-1, 2, 3, 4)

kevork
Download Presentation

LCLS-II will use sectors 11-20 (2 nd kilometer of SLAC linac) + a bypass line

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS-II Linac Layout Issues LCLS-II will use sectors 11-20 (2nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF in the first half of 20 (20-1, 2, 3, 4) Bypass line will start at 20-5 and needs to level out before the FACET wall This is 4 RF stations fewer than LCLS-I so we need to be efficient: Assume 225 MeV per RF station (18.5 MV/m over a 12-m section) Place the new BC1 at 250 MeV in 11-2, as in LCLS-I (21-2) Keep BC2 at similar energy (~4 GeV) so new CSR issues, but move as needed Assume L2 is at a worst case RF phase of j2-40° (user chirp option) Always provide 3 spare tubes in L2, plus 2 BC2-energy-feedback stations Typically provide 3 spare tubes in L3, plus 8 final energy-feedback stations Set L3 on crest and find acomfortable top-end energy for LCLS-II… bypass line FACET 20-1, 2, 3, 4 ~50 m ?

  2. Proposed Layout of LCLS-II High Power RF Stations Standard station (klys & ~12 m RF) E1 = 250 MeV E2 = 4.0 GeV j2-40° n Feedback station (klys & ~12 m RF) n Spare Feedback station (ditto) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 n 11 BC1 BC2 11 12 13 14 Spare RF station (ditto) n E3 = 13.6 GeV j3 = 0 TCAV3? (klys. 14-5) 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 15 16 17 18 19 20 14 BC2 will displace the 14-4 & 14-5 stations (14-4 is gone) 14-5 station will power a new TCAV3 at 14-7 Presently there is no RF in 11-3 (very old e+ system – re-install b,c,d) Should we locate BC1 at 11-3 (~450 MeV) to save money? Presently there is no RF in 19-7 (SLC e+ system – re-install? – no e+?) Presently there is no RF in 20-1 (historical? – re-install) Presently there is one missing section at 19-8d (re-install)

  3. Alternate (cheaper) Layout of LCLS-II High Power RF Stations Standard station (klys & ~12 m RF) E1 = 450 MeV E2 = 4.0 GeV j2-40° n Feedback station (klys & ~12 m RF) n Spare Feedback station (ditto) 1 2 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 n 11 BC1 BC2 11 12 13 14 Spare RF station (ditto) n E3 = 13.2 GeV j3 = 0 TCAV3? (klys. 14-5) 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 15 16 17 18 19 20 14 Leave 11-2 unchanged (12 m) and locate BC1 at 11-3, 450 MeV (save money) Then how to power L1X? Provide only two L2 spares at j2=-40° (i.e., 4 spares at j2=-32° nom.) Leave no RF in 19-7 (e+system remains) Leave no RF in 20-1 (save money) Final maximum comfortable energy is 13.2 GeV (|j3f|=30°)

  4. LiTrack Study in LCLS-II (Heater at 16 keV rms) 135 MeV after injector 0.07% 0.62 mm 1.1% 250 MeV after BC1 0.13 mm 0.41% 4.0 GeV after BC2 7.1 mm 13.6 GeV at undulator 0.01% 7.1 mm

  5. LCLS-IIAccelerator for 14 GeV, 120 Hz, 250 pC

  6. LCLS-I Injector Layout LCLS-II Phase-I Injector Layout LCLS-II Phase-II Injector Layout Use BXS magnet and short spectrometer beamline in these temporary positions