170 likes | 253 Views
ECN3 forthcoming activities 07/09/2010. Francois BUTIN CERN EN/MEF. MNP33 re-installation. MNP33 re-installation. Support blocs / rails grouting and leveling Civil engineering / surveyors : 13 – 27 Sept Magnet re-assembly with grey tube section: Dubna team + PH/DT: 11 Oct – 5 Nov
E N D
ECN3forthcoming activities07/09/2010 Francois BUTIN CERN EN/MEF
MNP33 re-installation • Support blocs / rails grouting and levelingCivil engineering / surveyors : 13 – 27 Sept • Magnet re-assembly with grey tube section: Dubna team + PH/DT: 11 Oct – 5 Nov • Piping adaptation: extend cooling pipes to new location. EN/CV, date to be confirmed • Water and power connection EN/EL, EN/CV, PH/DT • Tests: PH/DT
8 8 4 8 8 8 8 8 4 16 8 4 16 8 4 8 8 8
Blue tube removal of inner structures • 3 sections are concerned
Internal wall to be removed Brackets to be removed
Blue tubes refurbishment After cutting, grinding etc. • General cleaning, inside and outside (probably with dry vapor, test to be carried out soon) • Paint touch-ups. Paint type being investigated (paints for space applications possibly) • Re-installation of tube sections at (or close to) their final location
Conclusion:Infrastructure related activities (Automn 2010) • Launch Market Survey for beam dump (September), then Call for Tender (November) ECN3 9 m 2,8 m 2 m Carbon Iron Concrete
Conclusion:Infrastructure related activities (Automn 2010) • Launch Market Survey for beam dump (September), then Call for Tender (November) • Install Fire doors at bottom of PPG galleries (October) • MNP33 re-assembly (Sept-Oct) • Blue tube sections refurbishment (Oct-Nov) • Upgrade ECN3 40t crane with radio control (December)