EEP Update

EEP Update. Kevin H. Miller CVS-EEP Vegetation Monitoring Workshop Wake Technical Community College Northern Campus June 10, 2009. Begin with the End in Mind. Close-out! Close-out! Close-out!. Designer. As-Built Baseline. Monitoring Features & Baseline. Monitoring Firm.

kimo
Download Presentation

EEP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EEP Update Kevin H. Miller CVS-EEP Vegetation Monitoring Workshop Wake Technical Community College Northern Campus June 10, 2009

  2. Begin with the End in Mind • Close-out! • Close-out! • Close-out!

  3. Designer As-Built Baseline Monitoring Features & Baseline Monitoring Firm Year – 1 Monitoring Monitoring Years 2-5 Final SCO Report Mitigation Plan Construction to Monitoring Transition • Traditional

  4. Designer Monitoring Features & Baseline Monitoring Firm Final SCO Report Mitigation Plan Year – 1 Monitoring Monitoring Years 2-5 As-Built Baseline Construction to Monitoring Transition • New (on-going phase in)

  5. ‘08-09 Monitoring Action Items • Boundary marking needed • Encroachment • Invasives • Beaver • Channel repair assessment needed • Infrastructure at risk, hydro-trespass • Landowner need or conflict • Assets at risk (stream, wetland, buffer) • Field validation needed

  6. ’10-11 Monitoring • Revised Monitoring Template (Ver 1.3) • Upcoming meetings with Mac • More concise • Fewer tables, less narrative • Revised veg tables (from Simple Excel Report) • Refined Visual Morph Assessment • Consolidated MPV/CCPV • Better definition of “Problem Area” • Refined symbology

  7. Project CloseoutExpanding Role for EEP Monitoring Firms • First round of closeouts Summer 2007 • 10 wetland projects and 1 stream project (approx.) • Close out process and report templates • http://www.nceep.net/business/monitoring/Monitoring_report_web/Projects_in_Monitoring.htm

  8. Project CloseoutExpanding Role for EEP Monitoring Firms • Closeout Process and Report • Were goals and success criteria met? • Detailed asset verification (stream, wetland, buffer) • Asset mining as part of verification • Distilled assessment of performance/trends • Summary tables, graphs, drawings

  9. Project CloseoutExpanding Role for EEP Monitoring Firms • Distilled assessment of performance/trends and Summary tables, graphs, drawings • Examples: • Re-establish bankfull, recalculate CA’s and graph • Was there a stable pattern of variation over 5 years? • Were key variables maintained within bounds? • BHR • % Bank instability • Bedform diversity • Gauge performance percentages

  10. Project CloseoutExpanding Role for EEP Monitoring Firms • Asset Verification and Asset Mining • Final verification that restoration treatments meet regulatory definitions • Verifying boundaries and areas • Verifying regulatory buffer limits/requirements are met • Finding/defining overlooked assets • surplus buffer • components that classify as preservation opportunities • wetland features or their extent • Do component attributes justify ratio adjustments? • BMPs • headwater drainage capture • stressor removal

  11. EEP Restoration Plan Template(now “Project Implementation Manual” • First version 2005 • Updated April 2009 • Now part of new “Project Implementation Manual” • all deliverables: conceptual plan, ERTR, restoration plan, construction documents, project closeout documents (record drawings, etc) • construction management and administration

  12. EEP Restoration Plan Template(now “Project Implementation Manual” • major change affects planting plan-related tables • Table 7: Soil Preparation and Stabilization • Table 8: Temporary and Permanent Seeding • Table 9: Planting Summary Table • tables still the same • moved from Restoration Plan to Project Manual (and re-numbered)

  13. Project Implementation Manual

  14. Project Implementation Manual

  15. Project Implementation Manual

  16. Web Mapping System http://www.nceep.net/GIS_DATA/mapping/eep_web_mapping_system.html#Access

  17. Web Mapping(link to project docs at bottom of page) http://www.nceep.net/GIS_DATA/mapping/eep_web_mapping_system.html#Access

  18. Project Documents Web Page http://www.nceep.net/eep_projects/eep_projects.html

  19. Project Documents (xls)

  20. Questions?

  21. NC Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 (919) 715-0476 www.nceep.net Kevin H. Miller Research and Grants Coordinator (acting Vegetation Specialist) kevin.miller@ncdenr.gov 252.916.6576