1 / 5

PIP

PIP. Wednesday March 21,2012. 3/21/12 Agenda. Project Update(s) Pellico - PIP Status Talk(s) Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities Trevor Butler: Linac Modulator Upgrade - Work in Progress March 28:

kiona
Download Presentation

PIP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Wednesday March 21,2012

  2. 3/21/12 Agenda • Project Update(s) Pellico - PIP Status Talk(s) • Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities • Trevor Butler: Linac Modulator Upgrade - Work in Progress March 28: Craig Drennan – Booster Low Level Upgrades/Booster to MI phase lock

  3. Updates - • RFQ/LEBT • RFQ energy issue continues – Additional energy measurements are being planned • Waiting for vendor to analyze alignment data of RFQ rods • Redone measurements of Einzel Lens – will make some changes and re-measure • Re-measuring field flatness of RFQ • Budget News • No news yet – PO’s are being looked at/slowed down on second floor • Long Shutdown just 6 weeks away! • Lots of PIP related studies underway • Work continues on RLS/Tracking of effort • Elmie still completing tables • A short Booster kicker has been potted – ready to start on another

  4. Booster Absorber Review Complete Introduction: The current notching scheme in the Booster will not be adequate for the future 15 Hz operation due to high radiation losses. A new notching scheme has been proposed using 3 long kickers located at Long 12 that kick the beam horizontally into a new absorber at Long 13. We were asked to review the design and feasibility of the new notching system and comment on potential improvements. • Recommendations • Kickers: Use the bunch by bunch transverse damper diagnostics to map the notching kicker waveform. • Absorber: 1. Consider solutions for additional shielding on the wall side of the absorber that do not include sand bags. A direct comparison of the proposed additional steel vs. a comparable amount of concrete should be examined. At this point we may expect that the prompt radiation is dominated by moderate energy neutrons. To make a more complete containment inside the tunnel, one could fabricate shielding blocks special-made for this location. Vendors which make concrete shaped to specification are available locally. Consideration for 'heavy' concrete vs. the standard mix would be based on MARS simulations. Mokhov has a contact name at Argonne who regularly obtains specially shaped heavy concrete shielding.  2.Consider aisle side alternative designs that include marble.

  5. Talks Talk(s) • Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities • Trevor Butler: Linac Modulator Upgrade - Work in Progress

More Related