An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update Sept. 18th2013

  2. Agenda • Summary Update • Current Activities/Updates • Recent PIP News • Upcoming Talks, Reports, Meetings Updates/Talks: • Pat Sheahan - Plans for new Ferrite Measurements and Tuner Integration • Dan Bollinger - Source Development

  3. Update General Info • PreAcc Beam: RFFQ Driver PA changed – looks much better • Linac Beam: General Tuning • Booster Beam: Tuning – beam for HEP (When source is behaving – Booster @ ~4E12 • 10 - 14 turns -> MI • Studies still underway: • Transverse damper studies – not yet started – need to put system back together • Cogging software work continues – old system used in operation • Booster orbit smoothing – looks fine except for L22 (suspect misalignments) • Booster optics software – meeting next week to work out study plan • Booster Longitudinal dampers –software effort just starting, new boards? • Booster RF cavity rework • Cavity from RF17 reinstalled yesterday – had a vacuum issue • Booster RF19 tuner work underway – cavity on lathe getting ready for re-facing of inner flanges • RF8 removed last week because of RF leakage (this was the first refurbished) is in test area • There is some evidence of arching on back tuner • Spare Cavity Work – brazing plans? • Booster Ferrites (Talk today by Pat on first batch of low mu cores) • Were due 2nd or 3rd week of July – • Low Mu cores 60 on 8/23ship 9/11, 60 on 9/6 ship 9/18 and 76 (balance) on 9/27ship 10/3 • High mu cores – we are preparing a response before the next batch is made • HLRF – PO all signed off – but issues with purchasing agreement CPFF is causing issues!!! • Looking into an alternate SBK design • Releasing spec to CPI for SBK – looks very promising • Linac Modulator - testing continues (HV probes being purchased to allow for testing) • Booster Shielding – Discussions on how to proceed with beam based measurements and MARS • Short Kickers under test (Hardware of kicker PS is progressing – maybe a status talk?)

  4. Recent PIP Budget/News • Supplemental Funding – approved and nearly spent Several items still in bidding process - • Budget Issues – Submitted FY14 labor and Budget • Labor plan is in place – entirely expect it to change • PIP 11 M FY14 budget uploaded • New director has not given any signal to PIP to slow down or change course (setting up meeting for Nigel tour of PS) • Labor Issues • We have not had the expected labor on a few parts of PIP • Cavity refurbishment is the most glaring shortfall • MSD techs are supposedly available – waiting upon Matt for guidance • Looking into other options to move this process along • Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task • Need to post

  5. Upcoming Talks Sept 18: Dan Bollinger - Source Development Future Meetings to be Scheduled: • Kiyomi – Booster cogging plans • Eddy – Booster damper plans • Bill Pellico - Loss Scans and Shielding Assessment • Jon Reid - Solid State Installation - Final Report • Tan – RFQ Summary (after install of corrector and source B operating)