PIP Update

PIP Update. Aug 22 th 2012. Agenda. Summary Update Current Activities Updates/Talks: CY Tan - Overall RFQ Installation Brian Schupbach - Power Amplifier for the RFQ. Update. General Info Current Work Booster RF cavity 5 refurbishment - welding

ayoka
Download Presentation

PIP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update Aug 22th 2012

  2. Agenda • Summary Update • Current Activities • Updates/Talks: • CY Tan - Overall RFQ Installation • Brian Schupbach - Power Amplifier for the RFQ

  3. Update General Info • Current Work • Booster RF cavity 5 refurbishment - welding • Linac Transformer – questions remain about install / schedule • Booster Transformer – • LCW – Work Continues – on schedule • RFQ – final beam tests continue before install (ceremony recorded) • CW I- is being removed! Should go have a look….. • REPORT for High Power –Submitted proposal to Directorate (need to work on req order soon!) • High Power Ferrite Testing - Testing done!!! Working on ferrite purchase…. • Booster Absorber – absorber built now testing motor controls • Linac Modulator –SLAC and Continental web meetings (went well) • Booster Solid State Shutdown - comments (Fernanda, Todd, Mary) Updated Schedule (With RFQ updates) END OF Fiscal Year – deadline soon (have been signing more PO’s)

  4. Talks • CY Tan - Overall RFQ Installation • Brian Schupbach - Power Amplifier for the RFQ