Relay Modeling (a response to 2011 Arizona to California Outage)

Relay Modeling (a response to 2011 Arizona to California Outage). Tracy Rolstad June 2013. N Gila— Hassayampa (15:27:39) . 37 sec. New Solution ? Extended Term Dynamics?. Direct Response of MSRASTF. What happened during the 2011 outage? Overcurrent functions Distance Relays So…

kirima
Download Presentation

Relay Modeling (a response to 2011 Arizona to California Outage)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Relay Modeling (a response to 2011 Arizona to California Outage) Tracy Rolstad June 2013

  2. N Gila—Hassayampa (15:27:39) 37 sec New Solution ? Extended Term Dynamics?

  3. Direct Response of MSRASTF • What happened during the 2011 outage? • Overcurrent functions • Distance Relays • So… • Overcurrent relays are first • Well understood • Informal survey indicates there are not that many • Compared to distance devices

  4. Fall 2012 Assessment • Only PTI TIOCR model existed • “Curve” based input • Discussion with software suppliers… • GE created LOCTI by December 2012 (Yay!) • “Curve” based input • PowerWorld creates TIOCRS model (March 2013) • “Standard” equation based input • Behind the scenes just a curve

  5. Standard Curves for TIOCRS • TIOCRS (note “standard” inputs)

  6. LINE RELAY MODELS AVAILABLE

  7. Present State of the Art • TIOCR • LOCTI • TIOCRS • All of these work as expected • Of marginal use in transient stability (depends on settings) • Rather useful in power flow • Now imported into PowerWorld power flow

  8. Parameter Data Gathering • System Planning does not have access to parameters • Collaboration with the Protection Group to access data • The Protection Group supplied excel spreadsheet with the requested data – queried from database held in PowerBase program (an Avista experience) • Difficulty: relating database nomenclature with simulation nomenclature • Best approach may be by hand – automated relationship database hard to develop (depending on form of data from Protection Group)

  9. MVWG Action Required • Approve the Requirements AND the Models • TIOCR • LOCTI • TIOCRS • Precepts • Better is the enemy of good enough • Policy mandates action • We have a “Parking Lot” • Incremental software development=full employment plan

More Related