RPC Technical Trigger Status. Installation of RBC boards on the detector towers: done Cabling of negative wheels: cables ready, need to be installed Installation of TTU boards in USC55: 1 out of 3 (can cover up to 2 wheels)

kitty
Download Presentation

RPC Technical Trigger Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC Technical Trigger Status • Installation of RBC boards on the detector towers: done • Cabling of negative wheels: cables ready, need to be installed • Installation of TTU boards in USC55: 1 out of 3 (can cover up to 2 wheels) • The installation will be completed as soon as full production of Trigger Boards (Warsaw) will be delivered • Received from K.P. firmware for TTU Backplane  develop our part of fw to collect 5 wheel-level trigger and produce 1 Technical Trigger signal • ↓ • Complete the chain F. Loddo Bari RPC Meeting March. 2008

  2. Test to validate the implemented algorithm • At sector level: done last week with diagnostic Readout (from TB) • Tower level: tomorrow we try to use minidaq and TTU on W+1 (sect. 2-3-10-11) Unfortunately not full tower… • Wheel level (when ?) • Study the timing calibration for cosmic muons • xcheck with DT trigger • coupling with Global Trigger • Provide Trigger for May Global Run and CMS startup, as requested by Joao and Wesley  Mission: Impossible ??? Develop TTU Emulator (who?) Analyze Tracker Alignment “wishes” F. Loddo Bari RPC Meeting March. 2008