120 likes | 262 Views
Trigger System Status. Adele Di Cicco. T600 pixel definition. 28.8 cm. 86.4 cm. 9.6 cm. Trigger System. Adele Di Cicco Napoli 4 Febbraio 2004. LTCU. Main technical specification. Trigger definitions. TCU gives Global trigger when a MAJORITY condition is met in PMT logic.
E N D
Trigger System Status Adele Di Cicco
T600 pixel definition 28.8 cm 86.4 cm 9.6 cm
Trigger System Adele Di CiccoNapoli 4 Febbraio 2004
Trigger definitions TCU gives Global trigger when a MAJORITY condition is met in • PMT logic. • AWS logic. TCU gives Local Triggeraccording to data recorded during drift time.
GLOBAL/LOCAL trigger BUSY logic • After a trigger request TS gives the DRIFT signal to all v789 boards • During a DRIFT, TCU doesn’t accept any other trigger request and decides globality/locality of event. • After the DRIFT time, TS according to topology of event gives global trigger to all crate or local trigger to fired crates . • during a GLOBAL_BUSY (DAQ dead time for acquisition data download from all chambers) it accepts only a Local Trigger request
Flow Chart PMT AWS LTCU - PMT AWS - LTCU Discriminator Discriminator PMT Trigger condition logic Wire planes coincidence Logic (pixel fired) No Trigger request PMT local trigger request? Global trigger request Local trigger request PMT-pixels coincidences logic TCU Pixels Majority/Pattern logic Global drift or busy? Local drift or busy? Acquire only fired pixels No trigger Acquire all crates TS
General Idea on Partial majority Rack 13 Rack 11 • Each 100 msTCU makespictures of detector • Window runs on the detector • Majority condition is checked for each window • If majority condition (>1) is verified,horizontal scanning will start.
Freeze detector It Sums pixels in the stripe and it stores pixels in shift register It Sums two adjacent stripes Majority Condition is verified? end ACC=0 Start horizontal scanning It sums two adjacent pixels end ACC equal Total pix Sum equal 0? ACC=0 ACC=ACC+RowSum Spot detection
PIPELINE CLK ADDR[4:0] ADDRESS GENERATOR FLASH 9 A0_B[4:0] AND BLK INA SYNC BLK AA A1_B[5:1] MASK A2_B[6:2] 9 9 A3_B[7:3] ENC REG A A4_B[8:4] FLASH 13 A5_B[9:5] MASK A6_B[10:6] SYNC BLK BB A7_B[11:7] REG B INB A8_B[12:8] 1 13 13 PISO BLK 5 ACC SUM REG 5 Central Unit
Status of all system • LTCU prototype is finished and tested in the SER • Tests on DAQare going on these days (Pietro,Paolo,Adele). • The board’s documentation has been done (Adele,Maurizio). • Test will be finished at the end of February • Test at the CERN will be start on beginning of March (Adele) • TCU block scheme definition is in progress • New scheme can be proposed