An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft information note on the Annual Control Report and Opinion for 31/12/2009Ljubljana, 12-13 October 2009 Caroline Callens Deputy Head of Unit DG REGIO J.1, Coordination of audit , relations with the Court of Auditors and OLAF Ljubljana, 12-13 October 2009

  2. Objective of the note To clarify the Commission’s expectations with respect to the Annual Control Report and the Opinion for the year 2009. Ljubljana, 12-13 October 2009

  3. Introduction • The annual control report and opinion -> main source of assurance for the Commission in 2009 Ljubljana, 12-13 October 2009

  4. ACR 2009 – What to be reported ? • Second report • Findings of audits carried out during 01/07/2008-30/06/2009 -> System audits -> Auditsof operations (01/01/2007-31/12/2008) Ljubljana, 12-13 October 2009

  5. ACR 2009 – What to be reported ? • Any important information or any significant events occurring after the audit period -> should be reported and considered when establishing the level of assurance and opinion Ljubljana, 12-13 October 2009

  6. ACR 2009 – 3 cases 1) Expenditure has been declared in 2008 2) Significant expenditure declared by 31/12/2009 3) No or minimal amount of expenditure declared by 31/12/2009 Ljubljana, 12-13 October 2009

  7. Case 1 - Expenditure declared in 2008 - > annual control report and annual opinion to be provided in accordance with Article 62 (1) (d) (i) and (ii) of Council Regulation No 1083/2006 and Article 18 (2) of Commission Regulation 1828/2006 Ljubljana, 12-13 October 2009

  8. Case 2 : Significant expenditure declared by 31/12/2009 -> actual implementation of OP and systems are functioning -> system audits should have been performed in line with AS agreed and as discussed in the bilateral coordination meetings Ljubljana, 12-13 October 2009

  9. Case 2 : Significant expenditure declared by 31/12/2009 • However, maybe no audit of operations done -> no basis for determining an error rate -> complete ACR -> opinion based on the results of the systems audits with scope limitation for audits of operations Ljubljana, 12-13 October 2009

  10. Case 2 : Significant expenditure declared by 31/12/2009- Opinion ? Ljubljana, 12-13 October 2009

  11. Case 3 - No or minimal amount of expenditure(see information note 2008) -> only valid for a limited number of programmes Case 3 a) - > all audit work planned is done -> audit opinion Case 3 b) - > audit work planned has not been performed or limited audit work -> disclaimer of opinion Case 3 c) -> No sufficient audit work -> disclaimer of opinion Ljubljana, 12-13 October 2009

  12. Reminder • Audit opinions only based on the results on the CA are not considered appropriate • CA is on the set up of the MCS • Annual opinion concerns the effective functioning of the MCS Ljubljana, 12-13 October 2009

  13. The future of the Audit Reference ManualLjubljana, 12-13 October 2009 Caroline Callens Deputy Head of Unit DG REGIO J.1, Coordination of audit , relations with the Court of Auditors and OLAF Ljubljana, 12-13 October 2009

  14. State of play of the ARM Following documents are still in the pipeline: • Audit approach with regard to the simplified rules of eligibility on flat rate indirect costs, standard scales of unit costs and lump sums • Revision of the guidance note on the annual summaries • Update Financial Corrections guidelines C(2001)476 of 2.3.2001 Ljubljana, 12-13 October 2009

  15. New subjects? • Survey during Technical Meeting May 2007 Only 7 countries replied - > Very diverse requests ? -> Financial Engineering -> Article 73 -> Further suggestions ? Send mail to REGIO-AUDIT-COORDINATION@ec.europa.eu Ljubljana, 12-13 October 2009

  16. Process • Draft prepared by the Commission • Presented in Technical Meeting • Written comments requested from Member States –> revision of draft • Draft presented to the COCOF for information • Final Ljubljana, 12-13 October 2009

  17. How could we proceed for future guidance notes and revisions ? • Based on the need/experiences -> creation of a working group for informal discussions on subject Ljubljana, 12-13 October 2009

  18. What else can the Commission do ? • Provide checklists used by Commission Services via CIRCA ? (example CA&AS) • Provide checklists of MS in CIRCA? Ljubljana, 12-13 October 2009

  19. Future Technical Meeting ? • Commission presentations and Member States presentations -> exchange of experiences • Q&A sheets ? • Twice a year • Next technical meeting ->11 December 2009 -> Closure Ljubljana, 12-13 October 2009

  20. Thank you for your attention! Email: caroline.callens@ec.europa.eu Tel: 0032 2 299 39 27 Ljubljana, 12-13 October 2009