250 likes | 402 Views
D0 Trigger Status. 7 MHz input rate Data. Status reports March and Beyond. Framework. Data Log. L1 4.2 m s. L2 100 m s. L3 48+ ms. 50 Hz. 5-10 kHz. 1000 Hz. 48 nodes. 256 terms 128 bits. 128 bits. L1CAL. Detector/L1/L2 Components. L1 LUM.
E N D
D0 Trigger Status 7 MHz input rate Data • Status reports • March and Beyond Framework Data Log L1 4.2 ms L2 100ms L3 48+ms 50 Hz 5-10 kHz 1000 Hz 48 nodes 256 terms 128 bits 128 bits
L1CAL Detector/L1/L2 Components L1 LUM LUM L2Cal CAL L1 FPS FPS L2PS CFT/ CPS Global L2 L1 CTP L2CFT L2STT SMT L2 Muon L1 Muon Muon L2FW:Combined objects (e, m, j) L1FPD FPD L1FW: towers, tracks, correlations
Luminosity Monitor March 1 • Electronics • TDC preprod boards expected this week • 9 production boards arrive in March • Vertex FPGA design nearly complete • 2 Vertex boards finished in April • Installation • Detector mounted for 10 months. • Cables Installation started, ~1-2 wks. • One day of beam for timing. • Completion dates for various subsystems • Expect minbias triggers to be available at first beam, with Run I electronics. • Expect luminosity will be logged and made available on ACCNET within 1 week of first beam • Expect all electronics to be in place by the end of April • Expect multiple interaction triggers, luminosity database to be completed by the end of the year March L1 Luminosity: Minbias
L1 CTP/FPS/FPD Analog Status • AFE 8MCM (CFTax),(Fermilab-D0) • Have ten prototypes. • On bench, expect 2 weeks for LHB/RHB noise tests (<7 fC roughly 1 P.E.) • Four weeks to build, eights weeks to stuff. RHB mid/late-April. LHB mid-May. Need at least two weeks to check. • Earliest installation early May. • Order enough for entire central tracker. • AFE 12MCM (FPS): • Motherboard layout nearly done. • Daughterboard prototype has been simplified to reduce power consumption, heat load, and real-estate. • Corresponding reduction of capability: L3 readout of discriminated bits. • Prototype some time in April. • In April decide between modified AFE8 or AFE12
L1 CTP/FPS/FPD Digital Status • Mixer(Fermilab-CD) • A half super-sector expected this month. Bare boards this week (2 of 20 boards.) • Place order in March • Full Mixer April-May • Crate/PS on hand • DFEA/DFES/Broadcasters/ Collecters(Fermi-D0) • All 120 Motherboards here. • All 125 Transition modules here. • 35 of 88 DFEA single-wide daughter boards here. Complete boards this wk. • Double wide daughter boards here, parts mostly here. • Crates: 4/4 DFE, 1of2 CTT, 2/2 PS
Firmware Status • AFE: Complete • Digital: Design 90% / Code70% / Implementation 60% / 7 out of 14 units tested in hardware • Simulated/implemented entire DFEF+FPSS+FPTT Chain. • DFEA+CTOC+CTTT next few weeks • Expect CFT occupancy and track trigger April 2.
L1 CTP/FPS/FPD in March • Analog • 5-10 AFE8 prototypes. • Populate outer layers of upward pointing sector. Need to coordinate overlap with minimal L1 Muon configuration • Balance installed May-June • Digital • One-half sector mixer available • Some broadcaster/collector complement available. • Useful commissioning exercise. • Hit, track trigger. March 1: Some capability, mostly Installation/commissioning
L1 CAL Component Status • 10000 first stage adders(SUSB) • One for each electromagnetic and hadronic tower • Printed circuit boards complement mid-February • Require surface mounted resistors. Values recently determined imminently. Delivery late March. • Will concentrate on CC • 2500 Drivers(SUSB) • 4 calorimeter, 1 trigger tower per driver • Hybrid prototypes, 2 week turnaround, balance, six weeks. • Also need resistor values • Sufficient prototypes for 8-10 trigger towers • 320 analog pick-offs(MSU) • Now prototyped. Days. • Goal –0.8 < h < 0.8 by March 15th • Operating Status • Powered • New Control Software running. • Peparing to replace analog pickoffs.
L1 Cal in March • Tower Availability • March 1st a few (<10) towers • March 15th-20th CC • Depends on availability of adders/drivers/access • Towers over threshold • Global terms • March 30th Start EC • Detector/Trigger Commissioning. • Beam data to time in calorimeter towers. Starting w/ ‘scopes. • Calibrate L1 calorimeter trigger • Turn to EC March L1 Calorimeter: Commission w/ handful of towers Increasing capability through month
L1 MUON Component Status • Crate Manager(10) • 4/10 production available & reading out • Still verifying functions • Motherboard(62) • Production versions arriving 18/62, remainder ordered. • Testing in progress, worked out of box! • Preproduction as backup. • Trigger Manager Flavor Board(8) • 8/8 production due soon (<2weeks). • Should know soon if ready for March, very similar to preproduction • Preproduction as backup • Scintillator Flavor Board(28) • Submitted for production last week • Delivery ~4 weeks for stuffed boards. • Preproduction as backup
L1 MUON Component Status • PDT Flavor Boards(28) • 5/28 due soon (<2weeks) • Preproduction as backup • Infrastructure & Software • Cables/PS in progress • Still need ORC. • Download in place • Preproduction versions of all firmware. • No alarms, monitoring • MCEN crate manager • Preprod testing in progress • Begin fabrication early April • MCEN Centroid finder • Production layout in progress • Begin fabrication early March • MCEN Physics Boards • Production starting (<2weeks)
L1 Muon Outlook • March 30 • Central trigger crate with several wire and scintillator octants (prod) • End trigger crates each with one “scintillator” octant (prod) • One MCEN crate readout with a few MCEN’s (preprod) • April 30 • Trigger crates fully populated, cards in hand, depends on testing • July 1 • MCEN crates fully populated, in hand, depends on testing. March L1 Muon: A few central octants to start Increasing capability through month
L2 Component Status • a-processors (MSU,UIC,UVa) (15 minimum): • Production Status • Preproduction: 2 worked “out-of-the-box”. • First production failed: 0/~25 boards • Diagnostics @ CD,UIC • Since November Extensive repair program at CD, UIC • Problems with broken chips, vias, non-standard design practices. • Three boards work! Two more with minor problems, Six more promising • Future • Continuing Effort. Expect 6-11 cards by March 1st. • Examining layout, use remaining parts to make ~12 new boards. In progress. May-June? • Complete redesign based on off-the-shelf hardware, prototype summer (L2BETA)
L2 Components Cont. • MBT I/O Cards(U-Maryland) (30): • All production cards received. • To be checked by the end of March • Firmware functionality 90% done, complete mid-March • FIC L1/L2 Interface(SACLAY, UIC) (12) : • Boards complete • Some transmission errors noted. • Modified a single card at Saclay, testing this week. • SLIC Parallel Proc.(NIU,Columbia)(25): • Boards complete • DSP Central algorithm meet speed/efficiency requirements. Significant work on DSP forward. • Full development of software another 2 months. • CIC, SFO Muon/L2 Interface (U-Neb): • 2 CIC preprod: 1 passes, 1 has errors • SFO preprod passes most tests • Looking for production delivery end of April
L2 Status Continued • Operating Software • C++ Framework exists • Various Drivers in place by mid-March to April • Processor algorithms,fairly well developed • Global in simulation January • Cal in simulator January • Muon March • Infrastructure: • MCH and test stand racks and crates 95% done. • Cabling 65%, long runs complete, will start final dressing soon. • Complete in March
L2 Prospects • Feb/March • 6-11 Alphas: Test Stand (2), Global (2), Muon or Cal (2) • Attempt to complete Muon Integration (CIC/SLIC/SFO/ MBT/ALPHA) • Begin Cal Integration (FIC/MBT/ALPHA) • April/May • 6-23 Alphas: Test Stand (2), Global (2), Muon (2-4) or Cal (2-4), CTT/PS (2-5) • Preprocessors to Global • L3/DAQ • Start PS/CTT March L2: Depends on Repair Success, Commissioning Muon/CAL.
Digitizing Crates (2 of 16 groups) Data pathway o o o Receiver Collector (1 of 8) o o o VBDs Fiber Path (8 total) Event Tag Generator Levels 1,2 Trigger data o o o o o o Event tag path o o o o o o Segment Bridge Processor Nodes (4 groups of 16) DAQ/L3 Currently VRC, SB, ETG emulated w/ capability of ~500 kByte/second.
Implementation December, 2000 • Four unique types of cards • Event Tag Generator (ETG) (1) • Event Tag Generator Int. (ETGI) (4) • VBD Interface (VBDI) (8) • Serial Interface Board (SIB) (256) • SIB appeared in almost all components • VRC = VBDI + SIB • SB = ETGI + 12 SIB • Node = Motherboard + 4 SIB • SIB design nearly complete but could not be routed according to design rules. Too ambitious for form factor.
Implementation January 2001 • Response: • Simplify designs by building cards with functionality limited to specific site. • Short term: • Build a SIB1 or “SIBling” with functionality only required for VRC (to be used later in ETG) • Supplement this with increased ethernet capabilities. ~100Hz • Long term: • Stage upgrade by building SIB2 and SIB3 which are more specifically targeted to SB, L3Nodes, ETG and final VRC. • Current Status • SIB1 • At vendor, 20 bare boards to be shipped between Thursday and Tuesday • Assembled, at Brown 2/22 • VBDi • At vendor today or tomorrow. • Assembled, at Brown 2/22 • Designs of other cards well along, can be derived from work with original SIB
L3/DAQ Schedule • Stage1 3/22 • 50 Hz • VBDi/SIB at D0 • Ethernet upgrade • >100 Hz • Still discussing implementation • Stage 2 6/14 • ~200 Hz • Additional VRC,SB Hardware • Stage 3 7/19 • 1 kHz • Final Hardware • L3 Review Committee (Schamberger, Fuess, Blazey) reviewing design, schedule weekly March L3: 50 Hz Improving Capability
Filtering • Extensive Operating Experience • July Participated in SiDet 10% tests. • Sept unpacking calorimeter, muon • Nov Demonstrated streaming • January Mark&Pass, muon unpacking, TFW • Currently ported to NT • Filtering Control: L3FMarkandPass, L3Prescale • Filter tools: l3tCalunptool, l3fmuo_unpack • At First Beam • Calorimeter: MarkandPass, Calunpack, Single Jet, Missing Et • Muon: Scintillator Coincidence March L3filtering: Calorimeter unpacking Muon scintillator coincidence
Database • Trigger Database design nearly complete, includes all three levels. • Contains triggers lists for online running, trigger simulation, early running. • Production release soon. Hope to go on-line within a month or two. • Starting to work on user interfaces.
Trigsim • Production Release p06.00.01 now available • All L3 levels in ROOT format • Raw Data and Cal Trigger Tower Chunks • Default output • MC information • L1 Cal towers • L1FT, PS • L1 FWK • L2 Cal jet, mEt, electrons • L2 global jets, electrons • L3 Cal mEt, jets, kt jets, electrons, cft, global tracking, smt, tau • Use d0sim p07.00.01 • P08 Release • Will have a L1/L2 Trigger Menu • L1muon, L1ft, L2Global improvements
March Expectations • Level 1: • Minbias trigger • Commissioning Track/Preshower Trigger • Handful Calorimeter Trigger Towers • A few Muon Octants • Level 2: • Not in trigger • Depends on Alpha Repair • Integrating Muon first • Level 3: • Optimistically 50 Hz • Cal/Muon filtering March : Enough to get started Rapidly Changing
Long Term Expectations • Luminosity April • L1 Tracker (Central) >May • L1 Tracker (Forward) >June • L1 Calorimeter May • L1 Muon May • L2 Global/Cal/Muon June • L3 1kHz July • Some final comments • Lots of progress • People are working very hard. • Still along way to go • Preoccupation with hardware has lead to a great need for help with on-line programming.