1 / 16

Lake Washington Road project

Prepared for: Mr. Fran Lemieux Shaw Group. Lake Washington Road project. Project consists of 3 parts Project Controls Project scope Project schedule Cash flow Transportation Design Traffic analysis Pavement design Legal Aspects Contract development Negotiations. Project overview.

lily
Download Presentation

Lake Washington Road project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prepared for: Mr. Fran Lemieux Shaw Group Lake Washington Road project

  2. Project consists of 3 parts • Project Controls • Project scope • Project schedule • Cash flow • Transportation Design • Traffic analysis • Pavement design • Legal Aspects • Contract development • Negotiations Project overview

  3. Project scope Provide a brief description of the key project features: size, key features, cost Project Controls - 1

  4. Provide a drawing of the overall project and explain the features to your “client” in the briefing. Project controls - 2

  5. Diagram of project schedule here… explain the schedule to the client in your oral presentation Project controls - 3

  6. Project S-curve diagram here… explain in your oral presentation Project controls - 4

  7. Cite the key elements of the design • Traffic analysis • Pavement design • Other features Transportation Design

  8. Summary Traffic analysis - 1

  9. Pavement design - 2

  10. Diagram of pavement components… explain in your oral presentation Pavement design - 3

  11. Other features - 4

  12. Contract development Preparations for negotiations Legal aspects

  13. Elements of contract development • Topic 1 • Topic 2 • Topic 3 Legal aspects - 1

  14. Preparation for negotiations • Topic 1 • Topic 2 • Topic 3 Legal aspects - 2

  15. Schedule timing Cash flow Traffic summary Pavement features Contract development Project summary

  16. Shaw has a long history in transportation • We will produce a quality project • We appreciate your business • I will be your project manager • My contact information is: • Name • Telephone • Email Thank you for choosing shaw group

More Related