TM0 components inventory and procurement schedule. In lab testing facility. Inventory layout. RF system Accelerating structure (x16) PETS structure (x8) RF network and loads Vacuum system BI and Vacuum systems BPM-DBQ chamber assembly Magnet system Cooling system Supporting system
E N D
TM0 componentsinventory and procurement schedule In lab testing facility A.Bartalesi
Inventory layout • RF system • Accelerating structure (x16) • PETS structure (x8) • RF network and loads • Vacuum system • BI and Vacuum systems • BPM-DBQ chamber assembly • Magnet system • Cooling system • Supporting system • Pre-alignment system A.Bartalesi
Accelerating structureoverview Flange (VS) Compact load (RS) MB Unit (Assembly) Waveguides (RS) Manifold (RS) Intermodule interconnection (VS) Cooling tubes (RS) A.Bartalesi
RF systemAccelerating structure (1 of 4) A.Bartalesi
RF systemAccelerating structure (2 of 4) A.Bartalesi
RF systemAccelerating structure (3 of 4) A.Bartalesi
RF systemAccelerating structure (4 of 4) A.Bartalesi
PETS structureoverview DRIVE BEAM – PETS ASSEMBLY PETS On-Off (Coupler)(RS) Cooling adapter (RS) Cooling tubes (RS) PETS Minitanks(RS) Cooling fittings adapter (RS) PETS Mock-Up (RS) Interconnection Flanges (Fixed) (VS) Interconnection Flanges (Fixed) (VS) A.Bartalesi
RF systemPETS structure (1 of 3) A.Bartalesi
RF systemPETS structure (2 of 3) A.Bartalesi
RF systemPETS structure (3 of 3) A.Bartalesi
RF network and loadsoverview TYPE 1 TYPE 2 PETS Connection WG (RS) RF Load (RS) RF Load (RS) Choke Mode Flange (RS) Hybrid (RS) Splitter (RS) AS Connection WG (RF) A.Bartalesi
RF systemRF network and loads A.Bartalesi
Vacuum systemoverview Tube network Bellows Connection to central tank A.Bartalesi
Vacuum system (1 of 2) A.Bartalesi
Vacuum system (2 of 2) A.Bartalesi
BI systemoverview Rotating flange Ceramic Feed-through Vacuum chamber RF finger A.Bartalesi
BI System (1 of 3)(BPM-DBQ assembly) A.Bartalesi
BI System (2 of 3) (BPM-DBQ assembly) A.Bartalesi
BI System (3 of 3) (BPM-DBQ assembly) A.Bartalesi
Magnet systemoverview DBQ mock-up A.Bartalesi
Magnet system A.Bartalesi
Cooling system A.Bartalesi
Supporting systemoverview DB (boostec) MB (microcontrole) A.Bartalesi
Supporting system A.Bartalesi
Pre-alignment systemDB components only (1 of 2) A.Bartalesi
Pre-alignment systemDB components only (2 of 2) A.Bartalesi
Pre-alignment systemMB components only (1 of 2) A.Bartalesi
Pre-alignment systemMB components only (2 of 2) A.Bartalesi
Thanks for you interest -and- Thanks to all the procurement responsible people for their precious help! A.Bartalesi
Introduction to priority levels A “priority level” has been assigned to parts basing on their “indent level” in the project structure. Example: Priority level 0 Supplementary information Priority level 1 Priority level 1 Priority level 2 Priority level 2 The higher the priority level, the sooner we will need the part during assembly phase, if we are going to follow the assembling sequence defined by the drawings. If some changes in the mounting order are required for some few components, we can modify their priority level and keep the rest as is.
RF systemAccelerating structure (1 of 4) Supplementary information A.Bartalesi
RF systemAccelerating structure (2 of 2) Supplementary information A.Bartalesi
RF systemPETS structure Supplementary information A.Bartalesi