An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assembly and installation of CLIC TM0 Lab F. Rossi July 25, 2012

  2. TM0: accelerating structures Fiducialisation (W30) Transport to Lab (W30) Measurements on girders (W31) Assembly test for EBW tooling (W34) Transport to CERN workshop (W35) EBW of 2 stacks (W36) TIG welding of vacuum flanges (W37) Transport to Lab (W38) Installation on girders (W38)

  3. AS

  4. SUMMARY

  5. LAB CONFIGURATION: electric networks • Improvement of current electric network of Lab completed • Supporting system for: • Control valves (q.ty 7) • Flow transducer (q.ty 1) • Pressure sensor (q.ty 1) • Electric scheme for control valves, heaters, temperature sensors, etc. under design (J. Blanc) SSR POWER SOCKET Max. 63 A POWER SOCKET Max. 63 A DBQ heaters PETS heater AS heater Temperature sensors (q.ty 29) POWER SOCKET Max. 32 A POWER SOCKET Max. 16 A • CUPBOARD for: • NI cDAQ-9178 8 slots (q.ty 1) • NI cDAQ-9174 4 slots (q.ty 1) • 24 V supply • Digital control electronics for proportional valves (q.ty 7)

  6. LAB CONFIGURATION: hydraulic system Shoaib Azhar

  7. LAB CONFIGURATION: air temperature 1.2 m 1 m 1.3 m 2 m • 5 thermocouples for each section • 15 thermocouples in total • Continuous acquisition during tests NI 9213 16-Channel Thermocouple Input Module