TM0 components inventory and procurement schedule. In LAB testing facility. Procuring overview. Labels: 3D done 2D done Ordered Delivered. Accelerating structure overview. Flange (VS). Compact load (RS). MB Unit (Assembly). Waveguides (RS). Manifold (RS).
E N D
TM0 componentsinventory and procurement schedule In LAB testing facility A. Bartalesi
Procuring overview Labels: 3D done2D done Ordered Delivered A. Bartalesi
Accelerating structureoverview Flange (VS) Compact load (RS) MB Unit (Assembly) Waveguides (RS) Manifold (RS) Intermodule interconnection (VS) Cooling tubes (RS) A. Bartalesi
Accelerating structure 1/2 A. Bartalesi
Accelerating structure 2/2 A. Bartalesi
PETS structureoverview DRIVE BEAM – PETS ASSEMBLY PETS On-Off (Coupler) Cooling adapter Cooling tubes PETS Minitanks Cooling fittings adapter PETS Mock-Up Interconnection Flanges (Fixed) Interconnection Flanges (Fixed) A. Bartalesi
PETS structure A. Bartalesi
RF distribution and loadsoverview RF networks Type 2 Type 1 Load Mock-up Load Mock-up A. Bartalesi
RF distribution and loads A. Bartalesi
Vacuum systemoverview Vacuum network Central vacuum tank and pumps Type 1 Type 2 A. Bartalesi
BI systemoverview Vacuum chamber BPM mockup Rotating flange A. Bartalesi
Vacuum system A. Bartalesi