1 / 10

Workshop on transportation routes Region South-South East 24th November 2006, Vienna

Workshop on transportation routes Region South-South East 24th November 2006, Vienna. Agenda. Route description – capacity situation (1). UKRAINE-SK-CZ-GER (Velke Kapusany - Waidhaus) section 1: Velke Kapusany – Lanžot section 2: Lanžot – Waidhaus. capacity data as of November 2006

liz
Download Presentation

Workshop on transportation routes Region South-South East 24th November 2006, Vienna

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop on transportation routes Region South-South East 24th November 2006, Vienna

  2. Agenda

  3. Route description – capacity situation (1) • UKRAINE-SK-CZ-GER (Velke Kapusany - Waidhaus) • section 1: Velke Kapusany – Lanžot • section 2: Lanžot – Waidhaus capacity data as of November 2006 sources: www.spp.sk and www.rwe-transgasnet.cz • capacity situation on RTN system displayed as traffic light due confidentiality reasons (only 2 shippers)

  4. Route description – capacity situation (2) available capacities as of November 2006 source: www.spp.sk

  5. Route description – capacity situation (3) Entry/Exit couple capacity situation for section 2 source: www.rwe-transgasnet.cz

  6. Route description – capacity situation (4) Entry/Exit couple capacity situation for section 2 source: www.rwe-transgasnet.cz

  7. Route description – capacity situation (5) • congestion management procedures • short term: how is UIOLI applied, how is 2ndary market trading facilitated ? • long-term: expansion plans (open season) ? • capacity information • published numerically on monthly basis by SPP • traffic lights by RTN (more than 2 shippers on secondary market ?) • capacity allocation method • fcfs by SPP • Merit order (long term- short term), Pro-rata (yearly, daily)daily capacities - FCFS

  8. Route description – tariffs • tariff calculators for both sections of the route • are tariffs cost-based ? • tariff methodology not transparent • tariff structure • in SK: entry-exit • in CZ: postage stamp • transportation case • contracted capacity: 100.000 m³/h • tariffs of standard contract period for 1 year

  9. Conclusions • problems at border points (allocations, OBAs) • different Nm3 (at 20°C in SK, at 15°C in CZ) • transparency requirements of Regulation 1775/2005 not fully implemented on all sections of the route • confidentiality requirements justified?

  10. Agenda

More Related