Workshop on transportation routes Region South-South East 24th November 2006, Vienna

Workshop on transportation routes Region South-South East 24th November 2006, Vienna. Agenda. Route description – capacity situation (1). UKRAINE-SK-A-GER (Velke Kapusany - Oberkappel) section 1: Velke Kapusany – Baumgarten section 2: Baumgarten – Oberkappel.

parker
Download Presentation

Workshop on transportation routes Region South-South East 24th November 2006, Vienna

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop on transportation routes Region South-South East 24th November 2006, Vienna

  2. Agenda

  3. Route description – capacity situation (1) • UKRAINE-SK-A-GER (Velke Kapusany - Oberkappel) • section 1: Velke Kapusany – Baumgarten • section 2: Baumgarten – Oberkappel capacity data as of November 2006 sources: www.spp.sk and www.boggmbh.at • transit route not viable due to contractual congestion at section exit points

  4. Route description – capacity situation (2) available capacities as of November 2006 source: www.spp.sk

  5. Route description – capacity situation (3) sold capacities at Baumgarten (section entry) 18 months ahead source: www.boggmbh.at

  6. Route description – capacity situation (4) sold capacities at Oberkappel (section exit) 18 months ahead source: www.boggmbh.at

  7. Route description – capacity situation (5) • congestion management procedures • short term: how is UIOLI applied, how is 2ndary market trading facilitated ? • long-term: expansion plans (open season) ? • capacity information • published numerically on monthly basis by SPP and on daily basis by BOG • capacity allocation method • fcfs (in SK and A) • market survey by BOG

  8. Route description – tariffs • tariff calculators for both sections of the route • are tariffs cost-based ? • tariff methodology not transparent • transportation case • Contracted capacity: 100.000 m³/h (at 0°Celsius) • load factor of 100% • tariffs of standard contract period for 1 year • uniform conversion factor of 11,07 kWh/m³ (*) 2005 year or end 2005 data

  9. Conclusions • the transportation for new shippers on the route is not possible mainly due to contractual congestion at section exit points • transparency requirements of Regulation 1775/2005 not fully implemented on all sections of the route

  10. Agenda