An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. V CONGRESO INTERNACIONAL TRABAJOS CON TENSIÓN Y SEGURIDAD EN TRANSMISIÓN Y DISTRIBUCIÓN DE ENERGÍA ELÉCTRICA Y MANTENIMIENTO SIN TENSIÓN DE INSTALACIONES DE A.T. CITTES-2011-SALTA- REPÚBLICA ARGENTINA Autores: Ing. Daniel A. Cairol - Lic. Raúl A. Nicolini

  2. OBJETIVO PRESENTAR UN PROCEDIMIENTO OPERTATIVO PARA REALIZAR EL REEMPLAZO Y / O REPARACIÓN DE MANGUITOS DE EMPALME POR EL MÉTODO DE TRABAJO A POTENCIAL EN LINEAS DE 132 kV.

  3. INTRODUCCIÓN EXISTEN FACTORES QUE INFLUYEN SOBRE LOS CONDUCTORES COMO SON EL EFECTO CREEP, LAS DIFERENCIAS DE TEMPERATURA TANTO DE CARÁCTER CLIMÁTICO COMO LOS PRODUCIDOS POR LA CARGA DE LA LÍNEA, LAS VIBRACIONES, QUE SOMETEN A ESTOS EMPALMES A ESFUERZOS MECÁNICOS COMBINADOS.

  4. INTRODUCCIÓN CUANDO ESTOS MANGUITOS DE EMPALME SON MAL EJECUTADOS AL MOMENTO DEL MONTAJE DE LA LÍNEA, POR FALTA DE PRESIÓN DE LA BOMBA DE LA PRENSA HIDRÁULICA, FALLA DE LAS MATRICES DE COMPRESIÓN O QUE ESTAS MATRICES NO CORRESPONDEN AL MANGUITO DEL CONDUCTOR INSTALADO, PRODUCEN EL DESPRENDIMIENTO DE LOS CONDUCTORES CON LA CONSECUENTE FUERA DE SERVICIO DE LA LÍNEA.

  5. COMPRESIÓN DEFICIENTE DEL MANGUITO DE ALUMINIO

  6. CARACTERISTICAS DE LINEAS Tipo de estructura soporte: H° A° - TMA Tipo conductor: Al/Ac 240/40 mm2 - 300/50 mm2 Cable H°G° : Acero 50 mm2 . Vano promedio en estructuras H°A°-TMA : 250 m. / 320 m. Cantidad de estructuras entre retenciones: 8/9

  7. EQUIPOS Y HERRAMIENTAS ANDAMIO AISLANTE MODULAR

  8. EQUIPOS Y HERRAMIENTAS EXTENSIÓN AISLADA PARA HIDROGÚA

  9. EQUIPOS Y HERRAMIENTAS GRUPO GENERADOR PORTÁTIL 1200W CABEZAL DE COMPRESIÓN BOMBA HIDRÁULICA ELÉCTRICA PORTÁTIL 0-700 BAR

  10. HERRAMIENTAS Y ACCESORIOS • PINZA PARA TENDIDO AUTOAJUSTABLE. • APAREJO A CADENA P/3000 Kg. • FAJAS. • CONECTORES BIFILARES PARA CONDUCTOR • MANGUITO Al / Ac. • CONDUCTOR Al/Ac 240/40 mm2 - 300/50 mm2. • HERRAMIENTAS DE MANO. • SOGAS.

  11. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL BRAZO AISLANTE Y POSICIONADO DE LA HIDROGRÚA

  12. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL BRAZO AISLANTE Y POSICIONADO DE LA HIDROGRÚA

  13. DESARROLLO DEL PROCEDIMIENTO OPERATIVO PRUEBA DEL BRAZO AISLANTE

  14. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL ANDAMIO AISLANTE

  15. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL ANDAMIO AISLANTE

  16. DESARROLLO DEL PROCEDIMIENTO OPERATIVO PRUEBA DEL ANDAMIO AISLANTE

  17. DESARROLLO DEL PROCEDIMIENTO OPERATIVO POSICIONADO DEL ANDAMIO AISLANTE

  18. DESARROLLO DEL PROCEDIMIENTO OPERATIVO IZADO DE LOS EQUIPOS AL ANDAMIO AISLANTE

  19. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL BY-PASS

  20. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL BY-PASS

  21. DESARROLLO DEL PROCEDIMIENTO OPERATIVO ARMADO DEL BY-PASS

  22. DESARROLLO DEL PROCEDIMIENTO OPERATIVO INSTALACIÓN DE LAS PINZAS AUTOAJUSTABLE DE TENDIDO

  23. DESARROLLO DEL PROCEDIMIENTO OPERATIVO INSTALACIÓN DE LAS PINZAS AUTOAJUSTABLE DE TENDIDO

  24. DESARROLLO DEL PROCEDIMIENTO OPERATIVO INICIO REEMPLAZO MANGUITO-COMPRESIÓN DEL CONDUCTOR DE FASE

  25. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  26. DESARROLLO DEL PROCEDIMIENTO OPERATIVO PREPARACIÓN CONDUCTOR PREVIO AL CORTE

  27. DESARROLLO DEL PROCEDIMIENTO OPERATIVO CORTE DEL CONDUCTOR PARA REEMPLAZO DEL MANGUITO

  28. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  29. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  30. DESARROLLO DEL PROCEDIMIENTO OPERATIVO REPOSICIÓN DE MAGUITO ACERO

  31. DESARROLLO DEL PROCEDIMIENTO OPERATIVO MAGUITO ACERO NUEVO PREPARADO PARA COMPRIMIR

  32. DESARROLLO DEL PROCEDIMIENTO OPERATIVO MAGUITO ACERO COMPRIMIDO

  33. DESARROLLO DEL PROCEDIMIENTO OPERATIVO POSICIONADO MAGUITO DE ALUMINIO

  34. DESARROLLO DEL PROCEDIMIENTO OPERATIVO COMPRESIÓN DEL MAGUITO ALUMINIO

  35. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  36. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  37. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  38. DESARROLLO DEL PROCEDIMIENTO OPERATIVO

  39. CONCLUSIONES LOS EQUIPOS Y HERRAMIENTAS UTILIZADAS SON EMPLEADAS PARA OTROS MANTENIMIENTOS QUE SE REALIZAN NORMALMENTE TANTO EN LÍNEAS COMO EN ESTACIONES TRANSFORMADORAS. SE PROCEDIÓ A SU USO SIMULTANEO PARA LA TAREA. ESTE PROCEDIMIENTO SE TRADUCE EN UNA MEJORA EN LA CALIDAD DEL SERVICIO A NUESTROS CLIENTES EN PLAZOS MUY ACOTADOS.