An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POST CRISIS NEEDS ASSESSMENT (PCNA) GSP Implementation Support Mission Implementation Support Unit (ISU), GSP/PCNA Planning & Development Department Government of Khyber Pakhtunkhwa 22nd – 25thOctober 2012

  2. Introduction • Name of the Project: Governance Support Project - PCNA Implementation Support Unit • Location: P&DD Peshawar, Govt of Khyber Pakhtunkhwa • Signing Date: 11th October 2011 • Total Cost: Rs. 333.5 Million • Expenditure up to 30thSeptember 2012: PKR 19 Million • Objectives: To support government of Khyber Pakhtunkhwa to design and implement sectoral reforms.

  3. Progress • Recruitment of Internal Auditor • RFPs have been sent to the TOP ranked firms requesting technical and financial proposals by 23rd October 2012. • Project to be live in PIFRA system • Master data have been uploaded in the KP Server at Peshawar for: • 1. ERKF • 2. GSP-ISU, Khyber Pakhtunkhwa • Hiring of ISU positions • 6 out of 10 Specialists have been hired and are on-board • Pending 4 Specialists will be on board before the end of the year

  4. Progress • Seven Concept Notes prepared by ISU-GSP. (04 approved, two under process and one declined by the Bank) • 1. Khyber Pakhtunkhwa Judicial Academy: Inaugurated and training conducted from 27th August 2012 to 1st September 2012. • 2. Ombudsman: NOL has been awarded by the Bank and Procurement Plan has been developed and sent for NOL. • 3. Directorate of M&E: NOL has been awarded and Procurement Plan is under process.

  5. Progress • 4. Anti-Corruption Establishment (ACE): Concept Note has been developed and sent for NOL. • 5. Community Driven Development (CDD) project for Southern Districts of Khyber Pakhtunkhwa: The CDD based KP-SADP has been designed and handed over to LGE&RDD for Implementation. • 6. Home Department: Concept Note has been declined by Bank. • 7. Information Department: CN on Peace Building Communication Strategy for KP.

  6. Progress Training and Workshops • Orientation workshop at Donga Galli and World Bank Office, Islamabad (10th -13th July 2012) • Orientation workshop at MDTF Secretariat Islamabad (19th July 2012) • Results Based Monitoring workshop at World Bank Office(7th September 2012) • M&E Workshop at MDTF Secretariat Islamabad (19th September 2012) • Financial Management Workshop (27th September 2012)

  7. Progress • Identify sector specific PCNA recommendations and interventions and map to the departments /directorates • Needs Assessment exercise with all 10 departments of Agriculture, Livestock, Coop. and Fisheries Deptt. was conducted • Coordinated and attended the World Bank’s training on Small Scale Mining • Progress report of ERKP project of SMEDA and Industries Department monitored and evaluated • {{ • Number of visits was made to the World Bank, LGE&RD and Agriculture and Livestock departments

  8. Progress • Communication Strategy for Peace Building in KP: • Several meetings with Secretary Information and Director Information were held. • Focal person for developing a Comm. Strategy was appointed. • CN for devising a CS was prepared on 19th October 2012. • Draft Strategy has to be ready by mid-December 2012. • PCNA website live and functioning www.pcna.gkp.pk • PCNA Newsletter published and circulated • 18 Focal Persons by the line deptts. have been notified.

  9. Way Forward • Translation of PCNA recommendations into programs and projects. • Sustained international funding commitment by Donors. • There should not be a gap between needs and available resources.

  10. THANKYOU