1 / 2

AUTO IWG WP5 Telco 04.04.2012 Agenda

AUTO IWG WP5 Telco 04.04.2012 Agenda. O verview. Validas : Vision of Qualification Kit and Roadmap Status Validas : “ Seconds Steps ” on the roadmap (Design & Architecture , Test, MC/DC- Coverage measurement ,..) virtual vehicle: Review Tool Requirements for the Tool Chain Analyzer

Download Presentation

AUTO IWG WP5 Telco 04.04.2012 Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AUTO IWG WP5 Telco 04.04.2012Agenda

  2. Overview • Validas: Vision ofQualification Kit andRoadmap Status • Validas: “SecondsSteps” on theroadmap (Design & Architecture, Test, MC/DC-Coveragemeasurement,..) • virtual vehicle: Review Tool Requirements for the Tool Chain Analyzer • virtual vehicle: EPF Process Modeling (TC/TQ) • virtual vehicle: Simple Plug-in Development based on the Process • All: Feedback tofirst/secondsteps (ifavailable) • All: Discussion on nextsteps

More Related