Project battledship team gay avenue. MELODY KIDD (FALL TEAM LEADER) SCOTT MATSUO KELLY MCFARLANE (WEB TRAINEE) RAPHAEL RAMOS. TOPIC OUTLINE:. Project Background Design Challenges Important Decisions Risks Milestones Conclusion. Project background. What is project battLEDship ?

merlin
Download Presentation

Project battledship team gay avenue

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project battledshipteam gay avenue MELODY KIDD (FALL TEAM LEADER) SCOTT MATSUO KELLY MCFARLANE (WEB TRAINEE) RAPHAEL RAMOS

  2. TOPIC OUTLINE: • Project Background • Design Challenges • Important Decisions • Risks • Milestones • Conclusion

  3. Project background • What is project battLEDship? • A touch LED version of the classic game Battleship®! • Why build it? • How will it be built? • RGB LEDs • Phototransistor sensors • Printed circuit boards • Arduino

  4. Design challenges • FIGURING OUT HOW LED BOARDS WILL COMMUNICATE WITH EACH OTHER • CUSTOMIZATION OF THE PRINTED CIRCUIT BOARDS • ARDUINO CONNECTIONS WITH INPUT AND OUTPUTS • SOFTWARE

  5. Important decisions • SMD versus THROUGH HOLE LEDs • PUSHBUTTON versus REFLECTIVE sensor • USE OF ARDUINO

  6. RISKS • SENSORS • SURFACE MOUNTED LEDS • CODING • MICROCONTROLLER • BOARDS

  7. MILESTONES • FINAL BUDGET – 9/23/2013 • BASIC PROGRAM CODE COMPLETE – 10/12/2013 • LED/SENSOR BASEBOARDS COMPLETE – 10/31/2013 • PROGRAM CODE FOR BOARD CONNECTION COMPLETE – 10/31/2013 • LED/SENSOR UPPER BOARDS COMPLETE – 11/15/2013 • HARDWARE CONNECTION – 12/6/2013 • SOFTWARE/HARDWARE CONNECTION – 1/24/2014

  8. CONCLUSION • PROJECT BACKGROUND • DESIGN CHALLENGES • IMPORTANT DECISIONS • RISKS • MILESTONES