ME1/1 Electronics Integration and Commissioning

ME1/1 Electronics Integration and Commissioning. Mikhail Matveev Rice University July 20, 2012. Outline. The primary goal of this talk is to present a status of the ME1/1 test stand at CERN (building 904) and near future (2012) plans on electronics testing and commissioning. Goal.

nieve
Download Presentation

ME1/1 Electronics Integration and Commissioning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ME1/1 Electronics Integration and Commissioning Mikhail Matveev Rice University July 20, 2012

  2. Outline • The primary goal of this talk is to present a status of the ME1/1 test stand at CERN (building 904) and near future (2012) plans on electronics testing and commissioning USCMS CSC ME1/1 Upgrade Review

  3. Goal ● Integration tests of the ME1/1 chambers with new electronics: - Seven Digital CFEB boards (OSU) - New Spartan-6 based ALCT card (UCLA) [TBC] - Optical DMB board (UCSB) - TMB with new Virtex-6 mezzanine card (TAMU) - New LVDB board (JINR) with new LVMB mezzanine card (UCD) ● New firmware and software ● Standalone setup in bld.904 and (later) at p.5 based on EMU crate - no TTC interface - no Track Finder connection - no FED crate ● Similar to ME4/2 test stand next door in bld.904 USCMS CSC ME1/1 Upgrade Review

  4. Setup: Initial Configuration USCMS CSC ME1/1 Upgrade Review

  5. Setup: Target Configuration USCMS CSC ME1/1 Upgrade Review

  6. People Involved ● Vladimir Karjavin, Victor Perelygin (JINR) ● Petr Levchenko (CERN) ● Brant Rumberger, Dan King, David Nash, Joe Haley (NEU) ● Jason Gimore, Vadim Khotilovich, Idara Suarez (TAMU) ● Andrew Hart, Ben Bylsma, Carl Vuosalo, Stan Durkin (OSU) ● Jay Hauser (UCLA) ● Guido Magazzu (INFN/UCSB) ● Karoly Banicz (CERN) ● Jinghua Liu, Mikhail Matveev (Rice) USCMS CSC ME1/1 Upgrade Review

  7. ME1/1 Chamber Status in Bld.904 ● Sits in b.904 next to electronic racks ● Equipped with 7 old CFEB boards and new LVDB board ● Gas, HV, LV ready USCMS CSC ME1/1 Upgrade Review

  8. Test Stand Status ● Peripheral Crate: - Installed in the rack, power and cooling are being connected - CCB: ready - TMB2005: ready - DMB: ready - ALCT: installed on chamber - DDU: ready - VME Crate Controller (VCC): ready ● Computer: new emume11 (with UPS) - Network card for the DDU readout and VCC control (same as one at OSU): exists, on the way to CERN, expect to arrive July 23 ● Software: being installed and prepared, including the low-level functions for DCFEB in the PCrate core library USCMS CSC ME1/1 Upgrade Review

  9. ME1/1 Assembly Area at SX5 USCMS CSC ME1/1 Upgrade Review

  10. Near Future Plans (1) ● Install all the old peripheral boards, setup software and run initial debugging and connectivity tests: by August 1 ● Make chamber fully functional and run tests: by August 15 ● Ship new electronics to CERN: by August 15 - 7 pre-production DCFEB boards from OSU - TMB with new pre-production Virtex-6 mezzanine from TAMU - new optical DMB from OSU or UCSB ● Install new electronics, fibers and run initial debugging and connectivity tests: by September 15 ● Integration tests of new electronics with ME1/1: by October 15 ● Establish ME1/1 test setup at SX5: by November 15 ● Run integration tests at SX5: by December 15 ● Install production electronics (DCFEBs, ALCT, LVDB, LVMB) on four spare ME1/1 chambers and test them at SX5 before the other ME1/1 chambers are removed from the experiment: January – April 2013 USCMS CSC ME1/1 Upgrade Review

  11. Near Future Plans (2) USCMS CSC ME1/1 Upgrade Review