1 / 10

SBAC Implementation Plan

SBAC Implementation Plan. Timeline. SBAC Implementation Overview. Computer on Wheels (COWs) 40 Dell 11.6” Chromebooks (w/ mgmt software) 2 Aerohive Access Points (APs) 40 Wired Mice Earbuds. Allocations for schools Elementary: 3 to 6 Carts Middle: 4 to 7 Carts

onofre
Download Presentation

SBAC Implementation Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SBAC Implementation Plan

  2. Timeline

  3. SBAC Implementation Overview • Computer on Wheels (COWs) • 40 Dell 11.6” Chromebooks (w/ mgmt software) • 2 Aerohive Access Points (APs) • 40 Wired Mice • Earbuds • Allocations for schools • Elementary: 3 to 6 Carts • Middle: 4 to 7 Carts • High: 5 to 6 Carts • The number of devices were determined with the following constraints: • Four-week testing window • Only morning sessions. • Four days of testing per student

  4. Considerations for RUSD

  5. SBAC Bandwidth Test

  6. Elementary Plan - DRAFT Schedule 5th Grade Science CST when other grades are taking SBAC

  7. Middle School Plan – Performance Task- DRAFT

  8. Middle School Plan – CAT - DRAFT 2 Weeks

  9. Middle School Plan – Performance Task - DRAFT 2 Weeks

  10. High School Plan – Performance Task- DRAFT

More Related