An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2010 Mid-American Regulatory Conference AEP Need for Transmission Investment

  2. Renewable Energy Development 47% of Nation’s Generation Interconnection Queue

  3. Cost Allocation: Comparison to Other RTO’s Obtained from the PJM report titled “A Survey of Transmission Cost Allocation Issues, Methods and Practices” issued March 2010 ** Proposed methodology approved by SPP Board and pending FERC approval

  4. Transmission 7% Distribution 26% Generation 67% Components of Electricity Price Left Graph: Source Milken institute Report titled “Financial Innovations for Energy Infrastructure. The Grid, Renewables and Beyond” Right Graph: Obtained from the PJM report titled “A Survey of Transmission Cost Allocation Issues, Methods and Practices” issued March 2010

  5. RTO Transmission Investment 1 Obtained from RTO report card published 2009 by Christensen Associates and National Rural Electric Cooperation Association 2 Obtained from PJM 2009 RTEP report 3 Obtained from MISO 2009 MTEP report 4 Obtained from 2009 ERCOT Constraints and needs report 5 Obtained from 2009 SPP’s STEP report and does not include priority projects 6 Does not include 10,000MW of imports 7 Reflects existing wind capacity