Status FfM Chamber construction. Production status : 1 chamber L1C1 taped, not tested 1 chamber L0C1 taped, not tested 2 adjacent anode wires with wire tension < 40cN were repaired already two times would like to test it this chamber Plans for the future production: Continue with L0C1 :
E N D
Status FfM Chamber construction Production status: 1 chamber L1C1 taped, not tested 1 chamber L0C1 taped, not tested 2 adjacent anode wires with wire tension < 40cN were repaired already two times would like to test it this chamber Plans for the future production: Continue with L0C1 : Plan 1 per week Realistic estimate til fall 1 per 2 weeks Current problems: Broken Orbisphere