80 likes | 185 Views
TE-MPE-EM Overview. Betty Magnin. Overview. Mandate Structure Workload Infrastructure. Mandate. To provide a CERN-wide support for the layout the production the assembly in the domain of printed circuit boards flexible circuits hybrids and fine pitch detectors (MPGD).
E N D
TE-MPE-EMOverview Betty Magnin
Overview Mandate Structure Workload Infrastructure
Mandate • To provide a CERN-wide support for • the layout • the production • the assembly • in the domain of • printed circuit boards • flexible circuits • hybrids and fine pitch detectors (MPGD)
Structure Design, manufacturing and assembly Design Office Planning and subcontracting Technological and commercial choices Ordering, collecting components, trackingInvoicing 2 staff/ 2 FSU 1 staff / 9 FSU Repair MPGD Fine-pitch photolithography facility - PCB manufacturing Assembly Workshop Industry 4 Staff 8 staff/ 12 FSU
Workload Design office Outsourcing Internalproduction facilities
Infrastructure Today : spread on 3 locations (B1, B301, B102) By January 2014, B107, new building for TE-MPE-EM and TE-VSC
Infrastructure B867 Electronic workshop for the repair of radiated parts Available 2013/Q1