This summary provides an overview of the last 10 Tevatron stores, including completed studies and work. It also highlights any problems encountered during the week.
E N D
Store Summary Tevatron Coordinator - FNAL
The Last 10 Stores Tevatron Coordinator - FNAL
Studies/Work Completed • Timed in Pinger. ( 2 hours) • Lattice measurements. (5 hours) • AC dipole measurements. (2 hours) • PBJ proof of operation at 980Gev. • Smoothed orbits between stores. Tevatron Coordinator - FNAL
Bunch 12 for store 5871 Tevatron Coordinator - FNAL
Bunch 1 for store 5871 Tevatron Coordinator - FNAL
Comparing TRF trips; Left plot is store 5850 and TRF3 trip; Right is 5873 and TRF5 tripped Tevatron Coordinator - FNAL
Problems • T:VE16 tripped during store on over temp. No problems. T:VB16 developed fuse fault- replaced regulator. • T:HA24 terminated store 5863 due to bad cable splice. • BPM’s going into abort mode when suppose to be in closed orbit mode. BPM error lead to error for orbit stabilization which gets compensated for following store which cause tune shift resulting in large halo losses requiring rescrape and tuning. • T117 not working due to dead BLM houses. • D0Q6 ground fault due to plated ceramic. (10.6 hr DT) • Access F sector to fill T:F17K2 w/ Fluorinert. • TRF 5 tripped on PA LCW Off Tevatron Coordinator - FNAL
Studies for the Week • Studies for the week Tevatron Coordinator - FNAL