Taklimat Projek LAN Sekolah : Bersama Wakil JPN, BTPN, PPD. Pengenalan Objektif Komponen Projek Skop Kerja Kontraktor Peranan Bahagian /JPN/BTPN/PPD Fasa Pertama Perlaksanaan. Pengenalan.

rey
Download Presentation

Taklimat Projek LAN Sekolah : Bersama Wakil JPN, BTPN, PPD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TaklimatProjek LAN Sekolah: BersamaWakil JPN, BTPN, PPD Pengenalan Objektif Komponen Projek Skop Kerja Kontraktor Peranan Bahagian /JPN/BTPN/PPD Fasa Pertama Perlaksanaan

  2. Pengenalan • Projek Membekal, Menghantar, Memasang, Mengintegrasi, Mengkonfigurasi, Menguji, Mentauliah Rangkaian Kawasan Setempat Di Sekolah-sekolah, Kementerian Pelajaran Malaysia • Tender ini telah dianugerahkan kepada 7 Zon • Menyediakan infrastruktur rangkaian bagi menyokong aplikasi web tv, espkb,ep,HRMIS, PnP aplikasi • Menyediakan rangkaian yang secured

  3. Pengenalan - Samb

  4. Objektif • Menyediakaninfrastrukturrangkaianbagimenyokongaplikasi web tv, espkb,ep,HRMIS, PnP aplikasi. • Menyediakanrangkaian yang secured. • Meluaskanpenggunaanperkhidmatanrangkaiandisekolah. • Menyediakaninfrastrukturrangkaianuntuksokonganaplikasi • Mewujudsatusistemrangkaian yang teraturdanterurus • Menyediakaninfrastrukturrangkaianterkinikepadapengguna

  5. Komponen Projek • Structured Cabling Systems (SCS) • Vertical Cabling Systems • Horizontal Cabling Systems • Racks • Labeling • Electrical Works • SSO (Power Point) • Distribution Box • Local Area Network (LAN) • Core Switch • Access Switch • Wireless Network • Wireless Bridging • Wireless Access Point • Documentation • Latihan

  6. Komponen Projek - Samb • Vertical Cabling Systems • Fibre Optic Cables • 50micron MMF (Indoor and Outdoor) • 9micron SMF (Outdoor) • Fibre Panel (12 and 24 ports) • SC Connector • Fibre Patch Cords • Trunking

  7. Komponen Projek

  8. Structured Cabling Systems • Vertical Cabling Systems • Fibre Optic Cables • 50micron MMF (Indoor and Outdoor) • 9micron SMF (Outdoor) • Fibre Panel (12 and 24 ports) • SC Connector • Fibre Patch Cords • Trunking

  9. Structured Cabling Systems • Vertical Cabling Systems

  10. Structured Cabling Systems • Horizotal Cabling Systems • Cat 6 UTP Cables • Jack RJ45 c/w faceplate • UTP Patch Cords (1.2 and 3 meter) • Trunking • Patch Panel • Cable Management Panel • Trunking and Conduit

  11. Structured Cabling Systems • Racks • 33U Floor Standing • 12 U Wall mounted

  12. Structured Cabling Systems • Labeling

  13. Electrical Works • Power Point • Distribution Box

  14. Local Area Network • Core Switch • Access Switch

  15. Wireless LAN • Wireless Access Point • Wireless Bridging

  16. Documentation • Overview • Design • SAP • SPP (UAT) • Brochures • Shop Drawings

  17. Skop Kerja Kontraktor • Menyediakan Projek Charter • Membuat lawatan tapak ke lokasi • Project Management • Lawatan Tapak – vendor • Cadangan Network Architecture • Project Implementation • Training • Project Handover

  18. Skop Kerja Kontraktor – Samb • Step 1: Site Visit • Check Cable Route (Fibre, UTP, Electrical) • Get the UTP Point and SSO installation location document (sign off) • To understand the existing network setup • Step 2: Mobilization • Step 3: Structured Cabling Systems and Electrical Works • Lay tray and Trunking • Cable pulling and installation • Step 4: LAN and WLAN • Delivery, Configuration and Installation • SAP • Integration • Migration • Step 5: UAT (SPP, SPS) • Step 6: Training • Step 7: Documentation Submission • Step8: Site Handover (SPA)

  19. Peranan Bahagian di Kementerian • BPM / JPN • Memantau perjalanan projek secara keseluruhan • Mengesahkan rekabentuk rangkaian • Pembayaran • BTP / BTPN / PTPB / PKG • Memantau Kerja-kerja Yang dilaksanakan • Mengesah kerja-kerja yang dilaksanakan • Mengesahkan bagi tujuan pembayaran (SPP) • BPSK • Surat kebenaran Masuk Sekolah • Pemilihan Sekolah • BPPA • Kontrak

  20. FASA PERTAMA PERLAKSANAAN • Kategorisekolahadalahberdasarkaninfrastrukturmakmalsedia . (M1,M2,M3,M4,M5) • Sekolah yang dipilih :, SekolahBestari, Sekolah PTJ, Sekolah Cluster, SMT , SBP • KeseluruhanSekolah : 1051 • FasaPertamaperlaksanan :-