530 likes | 618 Views
RENAISSANCE LYON WP Progress and Plans WP 3: Demonstration. Pierre JOUTARD Deputy Director SPLA LYON CONFLUENCE. 1.4 THE PROJECT Basic long-term statistics (2030). 150 hectares (70 recyclable) 1,000,000 m2 net floor area 20,000 residents
E N D
RENAISSANCE LYONWP Progress and PlansWP 3: Demonstration Pierre JOUTARD Deputy Director SPLA LYON CONFLUENCE
1.4 THE PROJECT Basic long-term statistics (2030) 150 hectares (70 recyclable) 1,000,000 m2 net floor area 20,000 residents (7000 in 2000) 22,000 jobs (7000 in 2000) 3/30
THE PROJET Ongoing basic principles > Extension of the park along the Saône and rivers > Intermeshing of the park with the aquatic and urban spaces > Extension of major public transport networks > The links with the existing area > Redevelopment of the banks of the Rhône > Extension of existing roads towards the West and South; creation of links with Gerland
2.2.2 BLOCKS ABC 2008–2010 620 accommodation units – 15,000 m2 of offices – street-level shops
BLOCKS ABC 2008–2010 1.5 BLOCKS ABC ABC 2008–2009 620 accommodation units – 15,000 m2 of offices – street-level shops
Plot A NEXITY APPOLONIA 190 Flats +Leisure Tania Concko, Dusapin Leclerc, H Vincent
2.2.2 SAONE PARK NEXITY-APOLLONIA / Concko, Dusapin-Leclercq, Vincent 175 accommodation units
Plot B BOUFWONDS MARIGNAN 292 FLATS M FUKSASS, E AMENTEA, C VERGELY, HTVS
2.2.2 LYON ISLANDS MARIGNAN-ALLIADE / Fuksas, Amantea, HTVS, Vergély 292 accommodation units
Plot C ING/ATEMI MRDV, E GAUTRAND, P COMBAREL, E GAUTIER, VAN EGERAAT
II-2-2 LE MONOLITHE ING REAL ESTATE / Mass,Gautrand, Van Egeraat, Combarel,Gautier 152 accommodation units + offices
Logements libres bureaux Opac du grand Lyon: PLUS Bureaux PLI Alliade Opac du grand Lyon: PLUS PLI Alliade Habitat et Humanisme Résid handicapé Opac Rhône Logements libres Resid Handicap Opac Rhône Log libre Habitat et Humanisme Habitat et Humanisme
BLOCKS ABC IMPORTANCE OF HEQ le Monolithe /ING Energie gaz : 10% des besoins pour les ECS et 6% des besoins de chauffage Chaudière bois : 500kW : 94% des besoins de chauffage et 32% des besoins ECS Capteurs scolaires : 58 % des besoins ECS
2.2.2 BLOCKS E and F 2008–2009 230 accommodation units : 27% (social, rental), 23% (social, purchase), 50% (free purchase)
1.5 BLOCKS E and F 2008–2009 230 accommodation units : 27% (social, renta)), 23% (social, purchase)
2.2.2 BLOCKS E - HEQ 60 Housings «0 Energy» 1000 m² panneaux photovoltaïques E3 - BREMOND/ Lipsky-Rollet
STE-BLANDINE The existing neighbourhood 2-4 STE-BLANDINE The existing neighbourhood 7000 residents in 2007 – the first Council Housing Estate (1910’s)