1 / 8

Status & Schedule: 11 Dec 2007 - Kip Gardner Week Before Last

This week's fills (9364 to 9367) at Au at RHIC Injection and d at RHIC Injection. Integrated Luminosity Schedule. Physics production stores on weekends, evenings, and owls. Machine development on weekdays as needed to increase luminosity.

robinsonf
Download Presentation

Status & Schedule: 11 Dec 2007 - Kip Gardner Week Before Last

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. d-Au Status & Schedule 11 December 2007 Kip Gardner

  2. Week before last

  3. This Week’s Fills

  4. Fills 9364 to 9367

  5. Au at RHIC Injection

  6. d at RHIC Injection

  7. Integrated Luminosity

  8. Schedule • Physics production stores Weekends, Evenings and Owls. • Machine development Weekdays as needed to increase luminosity.

More Related