1 / 10

Post Point Treatment Plant Resource Recovery Project Update

Get the latest update on the Post Point Treatment Plant Resource Recovery Project, implementing the Climate Action Plan in an environmentally responsible and socially acceptable manner. Explore the proven technology, lifecycle costs, and sustainable aspects of the project across its five phases.

rreddy
Download Presentation

Post Point Treatment Plant Resource Recovery Project Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Post Point Treatment Plant Resource Recovery Project Update September 9, 2019

  2. Implementing the Climate Action Plan • Environmentally Responsible • Socially Acceptable • Proven Technology • Lifecycle Costs • Sustainable

  3. Project Divided 5 Phases • PHASE 1 – Define Conceptual Alternative • PHASE 2 – Refine Concepts • PHASE 3 – Implementation Plan • PHASE 4 – Predesign • PHASE 5 – Final Design, Construction & Operation

  4. Accomplishments • Completed Phases 1 & 2 • Screen World of Opportunities • Council & Community Goals • Engage Public in Solution • Refine Concepts • Selected Preferred Alternative • Incinerator Evaluation

  5. Phases 3, 4, & Nutrient Control Phase 3 • Update Facility Plan • Permitting • Data Collection • Procurement Evaluation • Financial Assessment • Marketing Report • Ongoing Stakeholder Outreach

  6. Phase 4 Preliminary Design • Site Layout • Process Diagrams • Mechanical • Structural • Electrical • Controls • Public Outreach

  7. Nitrogen Regulation Probable #7 on DOE list of dischargers

  8. Nutrient Removal & Drivers • Nitrogen Regulations Forthcoming • Post Point Footprint Limited • Significant Impact to Plant Capacity • Biosolids & Nitrogen Removal Linked • Uncertainty Surrounding Timing & Limits • Nitrogen Removal is Expensive

  9. Phase 3 & 4 Plus Nitrogen Removal • Gain Regulatory Approval • Refine Cost • Estimate Rate Impacts • Define Nutrient Removal Implications • Determine Project Delivery • ~$6.8 Mil 2019 - 2021

  10. Post Point Treatment Plant Resource Recovery Project Update Presented by: Robert Johnson Superintendent of Plant, Public Works 360.778.7735 rjohnson@cob.org

More Related