1 / 14

Withlacoochee State Trail – Dunnellon Trail Connector

Withlacoochee State Trail – Dunnellon Trail Connector. Citrus County Board of County Commissioners October 14 th , 2014. Project Details. Important connection linking Withlacoochee State Trail (46 miles) to Dunnellon Trail (2.5 miles). Project Steps.

salma
Download Presentation

Withlacoochee State Trail – Dunnellon Trail Connector

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Withlacoochee State Trail – Dunnellon Trail Connector Citrus County Board of County Commissioners October 14th, 2014

  2. ProjectDetails Important connection linking Withlacoochee State Trail (46 miles) to Dunnellon Trail (2.5 miles)

  3. Project Steps • Evaluation of alignment alternatives - Complete • Public meeting held on 9/15/2014 - Complete • BOCC selection of preferred alignment - Today • Acquisition of grant funding – Next Step • Design and permitting of trail connector • Construction

  4. Alignment Alternatives Withlacoochee State Trail (Gulf Junction Trailhead) Dunnellon Trail (CR 39 Trailhead) US 41 Crossing

  5. Alternative 1 1.09 miles No private property required Easement required from Duke Energy US 41 Overpass required Trailhead to Trailhead

  6. Alternative 2 1.28 miles No private property required Easement required from Duke Energy US 41 Overpass required Trailhead to Trailhead

  7. Alternative 3 1.34 miles Private property required US 41 Overpass required US 41 Overpass ramps may impact existing business access Not Trailhead to Trailhead

  8. Alternative 4 1.66 miles Private property required US 41 Overpass not required Right-of-Way required from CSX Not Trailhead to Trailhead

  9. Public Meeting Results Well attended and collaborative Comment cards indicated support of Alternative #1 (direct Trailhead to Trailhead connector) Significant dialogue related to Delmane Drive typical section: • One 12-ft wide multi-use trail vs. two 6-ft wide sections • Physical separation from vehicular travel lane • This topic will be addressed fully during design stage and will consider Right-of-Way and Drainage characteristics

  10. Alternative 1 Characteristics:Path Typical Section Similar to the existing trails (12 foot wide multi-use path) Withlacoochee State Trail Dunnellon Trail

  11. Alternative 1 Characteristics:Delmane DrivePreliminary Concept

  12. Alternative 1 Characteristics:Delmane DrivePreliminary Concept

  13. Alternative 1 Characteristics:Preliminary Bridge Concept

  14. RecommendedAlternative:Alternative 1 Shortest Trailhead to Trailhead No private property acquisition No significant issues identified Public support Finalize typical section Questions?

More Related