1 / 8

Whole Building Retro-Commissioning at BU’s Photonics Center

Whole Building Retro-Commissioning at BU’s Photonics Center. March 15, 2016. Photonics Center. Built in 1995 275,000 sq ft B-9 Floors Mixed use: Wet labs Dry labs Clean Rooms Classrooms Offices. Base Case. Building-wide simultaneous heating/cooling

sgonzales
Download Presentation

Whole Building Retro-Commissioning at BU’s Photonics Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Whole Building Retro-Commissioning at BU’s Photonics Center March 15, 2016

  2. Presentation Title Photonics Center • Built in 1995 • 275,000 sq ft • B-9 Floors • Mixed use: • Wet labs • Dry labs • Clean Rooms • Classrooms • Offices

  3. Presentation Title Base Case • Building-wide simultaneous heating/cooling • High air changes per hour (12-16+ ACH) • No further capacity of exhaust system on West Side • 500 1st generation VAV controllers limited memory • Controllers attached to 10MB Network Controllers

  4. Presentation Title Keys to Success • Buy-in from upper management • Support from, and partner with, BU EHS • Coordination of day-to-day space access

  5. Presentation Title Technical Assistance Study • Eversource funded 25% • National Grid funded 25% • Boston University funded 50%

  6. Presentation Title Technical Assistance Study ECMs Identified: • AHU Optimization • Conference, Classroom, & Office Ventilation Reduction • Lab Hood and Make-up Air Reduction • Strobic Fan Motor Replacement and VFD Retrofit • Boiler Controls Upgrade • Chiller Plant Integration and Optimization • Process Free Cooling

  7. Presentation Title Savings Summary • 2.2M kWh or 20% • 90K Therms or 25% • IRR +/- 25% Savings realized by going beyond “typical” RCx and incorporate “fundamental” design changes/optimizations

  8. Presentation Title Benefits • Occupant comfort • Operational improvements • “New” capacity for the future lab expansion

More Related