1 / 12

Simulace provozu JE typu AWBR

Simulace provozu JE typu AWBR. Lukáš Čížek, Ondřej Bačo. Obsah. Jaderné elektrárny ABWR Historie Konstrukce Využití Simulátor Havarijní odstavení Havárie napájecích čerpadel. Historie. Přímo vychází z BWR Postupným zjednodušováním Navržen a licencován 1978 Dnes hlavně v Japonsku.

shadow
Download Presentation

Simulace provozu JE typu AWBR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simulace provozu JE typu AWBR Lukáš Čížek, Ondřej Bačo

  2. Obsah • Jaderné elektrárny ABWR • Historie • Konstrukce • Využití • Simulátor • Havarijní odstavení • Havárie napájecích čerpadel

  3. Historie Přímo vychází z BWR Postupným zjednodušováním Navržen a licencován 1978 Dnes hlavně v Japonsku

  4. Specifikace Elektrický výkon: 1300 MW Počet regulačních tyčí: 205 Tlak v reaktoru:7,07 MPa Tepelný výkon: 3900MW

  5. Způsob regulace Regulační tyče Regulace průtoku smyčkou Regulace průtoku AZ Obsah kyseliny borité

  6. ABWR elektrárna

  7. Simulátor

  8. Havarijní odstavení

  9. Havárie napájecích čerpadel

  10. Zdroje FJFI – Katedra jaderných reaktorů IAEA Boiling water reactor simulator Workshop material, IAEA 2003

More Related