1 / 8

P25 Update: Dominant Digital System for Public Safety

Learn about the latest updates in the P25 program, including technology improvements, feature enhancements, and enhanced infrastructure interoperability. Explore the dominance of P25 as the leading digital system for public safety.

sherriee
Download Presentation

P25 Update: Dominant Digital System for Public Safety

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P25 Update Paul A. Wardner KAØNDS Business Development Manager Public Safety

  2. P25 Update • TIA-102 (P25) is 26 years into the program • Group made up of manufacturers and agencies • Interop and Open standard Prime motivator • Dominant digital system for Public Safety • Technology improvements (IMBE →AMBE+2) • Feature enhancements / rollout continuously • Enhanced infrastructure interoperability

  3. P25 – Phase 1 systems

  4. P25 – Phase 1 systems • 900MHz systems is lowest number of systems • VHF is 2nd smallest number of installed systems • UHF is 2nd largest number of installed systems • Federal market represents the majority of UHF systems which also are mostly closed to vendors other than the system vendor installed. • 700/800 is largest number of installed systems • Some VHF systems also have 700/800 sites

  5. P25 – Phase 2 systems

  6. P25 – Phase 2 systems Phase 2 offers increased channel capacity

  7. P25 Phase 2 Myths Addressed Misconceptions and common myths regarding APCO Phase 2

  8. Thank you !

More Related